Here is a list of the materials below the project description which do not have links to the data files:
Supporting Documents
• Aerial View
• Zoning and map and floodplain information
• Trinity River Balanced Vision Plan
• Trinity River Comprehensive Land Use Plan
• Planned Development District 800
• LIDAR Contours
• Soils
• Current City of Fort Worth standard roadway details
• Predevelopment Hydrograph and related assumptions
• Survey/Plat
• Current City of Dallas standard roadway details (Paving Design Manual and Draft Complete Streets Manual, if available)
• City of Fort Worth Bike Plan
• Belleview Connector conceptual plan
We will need all of the materials listed above, if you can get your hands on them, except for the aerial view and survey plat. Here is a link to the materials which I have been able to download:
Web site for project materials:
Urban Redevelopment Design Challenge:
Northern Crossing West (Clarion / TIG), Fort Worth, Texas
There are links to all of these materials:
Description
Mitigation Report 2005
Mitigation Submittal 2005
Aerial with Buildings
Development Restriction
Final Geotech Report
Final Survery Phase 1
Traffic Analysis
Northern Crossing Plat
Northern Cross Boulevard: Natural Resources Impacts Assessment and Mitigation Plan
Phase I Environmental Site Assessment Update July 1997
Bid Tabulation - Northern Crossing
Thanks again for your help.