Latent Variables:
Estimate Std.Err z-value P(>|z|) Std.lv Std.all
VAC =~
L1 1.000 0.356 0.518
L2 2.644 0.406 6.519 0.000 0.942 0.734
L3 2.808 0.545 5.155 0.000 1.001 0.680
L4 1.144 0.249 4.590 0.000 0.408 0.443
Does that mean there is a non-significant relationship between the latent variable VAC and the manifest variable L1?
Does it matter if the relationship is non-significant? I know a factor loading >0.3 is preferable, but I am not sure how to interpret the significance of the relationship.
Thank you very much.
what does the value P(>|z|) mean? Is that the significance level for the factor loading?
Estimate Std.Err z-value P(>|z|) Std.lv Std.all
VAC =~
L1 1.000 0.356 0.518
Does that mean there is a non-significant relationship between the latent variable VAC and the manifest variable L1?
--
You received this message because you are subscribed to a topic in the Google Groups "lavaan" group.
To unsubscribe from this topic, visit https://groups.google.com/d/topic/lavaan/XpAyOXx9JBw/unsubscribe.
To unsubscribe from this group and all its topics, send an email to lavaan+unsubscribe@googlegroups.com.
To post to this group, send email to lav...@googlegroups.com.
Visit this group at https://groups.google.com/group/lavaan.
For more options, visit https://groups.google.com/d/optout.