I am talking of sail cooperative society namely GREEN HEAVENS.Since I am an electrical engineer and was secy of the society from getting plot to allotment of flats I preffered the single point connection at 11kv because
1.the quality of supply voltage at 230/440, wiring, meter cutouts were totally substandard from erstwhile DESU
2.By going for single point cnnection by installation of best equipments for sub station,good cables good quality distribution boards& meters the quality of voltage was ensured making use of voltage stablisers unnecessary.
DG sets with AMF panel ensured the outage of power not more than 1/2 a minute
3.With discount of 15% we cud supply electricity at less than DESU rate
4.our elected class being of scoundrel category they take pleasure in hurting the honest responsible tax payer citizens.They know this class can not fight for longAlthouh this issue was raised by me at public hearing to which I was invited by DERC
5 So far electric system is concerned it is absolutely fine
6If DF as a body takes it up things may work out
chetal sk