Is this HotFix released yet?

0 views
Skip to first unread message

Jason

unread,
Nov 9, 2007, 12:45:00 AM11/9/07
to
In the list of hotfixes mentioned in another post, there was one listed as:

PendingPSVR2007 homepage performance degrades with lots of risks or
issues
(sometimes the page will timeout)

Has this one been released yet and does it have a number? It takes 15+
seconds to load the main pwa page due to the risks and issues and sometimes
times out. If we hide the "Reminders" web part, access is quick. If we go
to the Issues and Risks link, again it takes forever to load. I'd really
like to have this hotfix before we go live with our migrated instance of
Project Server, but cannot find it......

Jonathan Sofer

unread,
Nov 9, 2007, 2:12:54 PM11/9/07
to
Yes, it is released and can be downloaded. However, it comes with all of
the following fixes and there is no way to separate the hotfix from the rest
of these.

Rollup KB 938891

#18422: PSVR2007 - Assignments with Proposed Resources are published to PWA
and visible in My Tasks

#18925: PSVR2007 - Reporting database does not contain the capacity value
for Generic Resources
#17935: PSVR2007 Cleanup of FAC feature from code base presence limits
scalability
#18009: PSVR2007 Drilling into Project from the Project Center can be slow
#18618: PSVR2007 Syncing to WSS Root site can take up to what appears to be
48 hours
#18670: PRJSVR2007 Unable to link an issue to a task when the task number is
greater than 100
#18784: PSVR2007 Can't change the owner of a project plan in PWA
#18822: PSVR2007 -DCR- Unable to enter work estimate when creating new task
in PWA.
#18832: PSVR2007 -DCR- Task IDs are unavailable when creating new task in
PWA.
#18833: PSVR2007 -DCR- Task IDs are unavailable for My Work views.
#18845: PSVR2007: Users get 'An unexpected error has occurred' when
accessing the PWA homepage
#18870: PSVR2007 - Deny the 'Create new Activity or Proposal' global
permission causes an error in Build Team from Enterprise.
#18914: PSVR2007 - DCR - My Tasks Page - Need Collapse Functionality
#18915: PSVR2007 homepage performance degrades with lots of risks or issues

(sometimes the page will timeout)

#18935: PSVR2007 - Task Updates need improved visibility
#18956: PRJ2007 - Use of local calendar results in variance between PWA and
Pro views

Jonathan

"Jason" <Ja...@discussions.microsoft.com> wrote in message
news:A0E7E3BC-9DFD-4A4B...@microsoft.com...