      Stone Mandi Site (IP Site) were handed over for I & C to M/s ZTE under Ph VII.2. M/s ZTE delivered the material at Site but at that time site was not prepared from IP end so material of the site was taken over by Kota SSA. Now the site has prepared by IP for integration and commissioning. 

   Now as discussed in meeting on dated 19.06.2017, M/s ZTE is requested to integrate the site on priority. Kota SSA will hand over the taken over material to M/s ZTE.

--
 
 
With Regards
HEMANT YADAV