FW: SSP-MGKT-TRANSMIT-058770: Re: CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT

2 views
Skip to first unread message

Chee, Sek Fong Vincent

unread,
Oct 15, 2024, 5:32:55 AM10/15/24
to Mohd Fauzi, Shawana (shawana@zaidun-leeng.com.my), zlmrt...@googlegroups.com, zlmrt...@googlegroups.com

Dear Fauzi/ Shawana,

 

FYI - see email from Peter and Kumar below regarding updating of models in Projectwise.

 

But I also noticed that MRTC has granted you access to PW again (see email received 4.56pm).

 

Can you respond urgently please.

 

Thanks,

Vincent

 

 

From: Peter Goh Khoon Yaw <pete...@kvmrt-ug.com.my>
Sent: Tuesday, October 15, 2024 5:20 PM
To: Kumaravelan A/L Mayavan <MKumar...@kvmrt-ug.com.my>; Chee, Sek Fong Vincent <Vincen...@aecom.com>
Cc: Wan Nur Intan Suraya Binti Ahmad <WNIS...@kvmrt-ug.com.my>; Rahimee Bin Musa <Rah...@kvmrt-ug.com.my>; Mohammad Azim Bin Mohd Nasir <Mohamm...@kvmrt-ug.com.my>; Manivannan a/l Murugiah <MMani...@kvmrt-ug.com.my>; Mohd Asfahani Bin Sukiman <mohdas...@kvmrt-ug.com.my>
Subject: RE: SSP-MGKT-TRANSMIT-058770: Re: CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT

 

Since MRTC already terminated access to Projectwise for TC, going forward, any update to As-Built Model and 2D cut-sheets Drawings, after rectification/ remedy works during DLP, has to be carried out offline. Treat this as the same. I am sure

Since MRTC already terminated access to Projectwise for TC, going forward, any update to As-Built Model and 2D cut-sheets Drawings, after rectification/ remedy works during DLP, has to be carried out offline. Treat this as the same.

 

I am sure DDCs has the latest REVIT model that was last shared in hand-over model to MRTC in Projectwise. Just use that to update. Keep the updated model within DDC and share with MGKT. There is no need to share updated model to MRTC anymore, as the official means of sharing via PW is no more available.

 

 

-------- Original message --------

From: Kumaravelan A/L Mayavan <MKumar...@kvmrt-ug.com.my>

Date: 15/10/2024 5:03 pm (GMT+08:00)

To: "Chee, Sek Fong Vincent" <Vincen...@aecom.com>

Cc: Wan Nur Intan Suraya Binti Ahmad <WNIS...@kvmrt-ug.com.my>, Rahimee Bin Musa <Rah...@kvmrt-ug.com.my>, Mohammad Azim Bin Mohd Nasir <Mohamm...@kvmrt-ug.com.my>, Manivannan a/l Murugiah <MMani...@kvmrt-ug.com.my>, Mohd Asfahani Bin Sukiman <mohdas...@kvmrt-ug.com.my>, Peter Goh Khoon Yaw <pete...@kvmrt-ug.com.my>

Subject: RE: SSP-MGKT-TRANSMIT-058770: Re: CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT

 

Hi Vincent,

 

We were informed by Rahimee that MRTC has terminated the service for Project Wise. I suggest we don’t go into Project Wise as there a commercial dispute on this.

Can it be done in ZL’s own platform and LDC & DDC keep a record of it?

 

Regards,

Kumaravelan A/L Mayavan
Senior Manager - Quality Assurance/ Quality Control
Quality Assurance/Quality Control Department

Image removed by sender.

CONFIDENTIALITY NOTICE:
This email message is for the sole use of the intended recipient (s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is strictly prohibited. If you are not the intended recipient, contact the sender via email reply and destroy all copies of the original message.

From: Chee, Sek Fong Vincent <Vincen...@aecom.com>
Sent: Tuesday, 15 October, 2024 5:01 PM
To: Kumaravelan A/L Mayavan <MKumar...@kvmrt-ug.com.my>
Cc: Wan Nur Intan Suraya Binti Ahmad <WNIS...@kvmrt-ug.com.my>; Rahimee Bin Musa <Rah...@kvmrt-ug.com.my>; Mohammad Azim Bin Mohd Nasir <Mohamm...@kvmrt-ug.com.my>; Manivannan a/l Murugiah <MMani...@kvmrt-ug.com.my>; Mohd Asfahani Bin Sukiman <mohdas...@kvmrt-ug.com.my>; Peter Goh Khoon Yaw <pete...@kvmrt-ug.com.my>
Subject: RE: SSP-MGKT-TRANSMIT-058770: Re: CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT

 

Hi Kumar,

 

ZL needs to update the CLYS model in Projectwise to close out the last comment. But they are having problems with Projectwise access. We have already requested assistance from MRTC and working with them to sort it out.

 

We will target to respond and close by this week.

 

Regards,

Vincent

 

 

From: Kumaravelan A/L Mayavan <MKumar...@kvmrt-ug.com.my>
Sent: Tuesday, October 15, 2024 4:49 PM
To: Chee, Sek Fong Vincent <Vincen...@aecom.com>
Cc: Wan Nur Intan Suraya Binti Ahmad <WNIS...@kvmrt-ug.com.my>; Rahimee Bin Musa <Rah...@kvmrt-ug.com.my>; Mohammad Azim Bin Mohd Nasir <Mohamm...@kvmrt-ug.com.my>; Manivannan a/l Murugiah <MMani...@kvmrt-ug.com.my>; Mohd Asfahani Bin Sukiman <mohdas...@kvmrt-ug.com.my>; Peter Goh Khoon Yaw <pete...@kvmrt-ug.com.my>
Subject: RE: SSP-MGKT-TRANSMIT-058770: Re: CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT

 

Aconex Email Notification Hi Vincent, My email dated 8/11/24 is referred. Please advise the current status of the report as I have a meeting with Mr. David Yek tomorrow on all the outstanding items. Thanks. Regards, Kumaravelan A/L Mayavan Senior

Hi Vincent,

 

My email dated 8/11/24 is referred. Please advise the current status of the report as I have a meeting with Mr. David Yek tomorrow on all the outstanding items. Thanks.

 

Regards,

Kumaravelan A/L Mayavan
Senior Manager - Quality Assurance/ Quality Control
Quality Assurance/Quality Control Department

Image removed by sender.

CONFIDENTIALITY NOTICE:
This email message is for the sole use of the intended recipient (s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is strictly prohibited. If you are not the intended recipient, contact the sender via email reply and destroy all copies of the original message.

From: Kumaravelan A/L Mayavan
Sent: Tuesday, 8 October, 2024 8:21 AM
To: Chee, Sek Fong Vincent <Vincen...@aecom.com>
Cc: Wan Nur Intan Suraya Binti Ahmad <WNIS...@kvmrt-ug.com.my>; Rahimee Bin Musa (UGJV) <Rah...@kvmrt-ug.com.my>; Mohammad Azim Bin Mohd Nasir <Mohamm...@kvmrt-ug.com.my>; Manivannan a/l Murugiah <MMani...@kvmrt-ug.com.my>; Mohd Asfahani Bin Sukiman <mohdas...@kvmrt-ug.com.my>
Subject: FW: SSP-MGKT-TRANSMIT-058770: Re: CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT

 

Hi Vincent,

 

We are yet to receive the response from you for the transmittal shown in email below.

Since both the issues addressed by DDC 7 in the DRR have been closed, please issue Code 1 in order for us to submit to MRTC and close the outstanding items.

 

Please revert by today as this is pending since July-2024. Thanks.

 

Regards,

Kumaravelan A/L Mayavan
Senior Manager - Quality Assurance/ Quality Control
Quality Assurance/Quality Control Department


Image removed by sender.

CONFIDENTIALITY NOTICE:
This email message is for the sole use of the intended recipient (s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is strictly prohibited. If you are not the intended recipient, contact the sender via email reply and destroy all copies of the original message.

From: Aconex Notification (SSP - UNGW) <nor...@aconex.com>
Sent: Tuesday, 2 July, 2024 11:11 AM
To: Kumaravelan A/L Mayavan <MKumar...@kvmrt-ug.com.my>
Subject: SSP-MGKT-TRANSMIT-058770: Re: CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT

 

 

Dear Kumaravelan A/L,

You have received a new Transmittal: SSP-MGKT-TRANSMIT-058770

Project:

  

SSP - UNGW

Type:

Transmittal

Mail Number:

SSP-MGKT-TRANSMIT-058770

Reference Number:

SSP-MGKT-TRANSMIT-053622

To:

Mrs Fara Zuana Abd Hamid Mohd Zin, AECOM Perunding
Vincent Chee, AECOM Perunding

Cc:

Mr Kumaravelan A/L Mayavan, MMC Gamuda KVMRT (T) Sdn Bhd
Ravi Subramaniam, MMC Gamuda KVMRT (T) Sdn Bhd

From:

M DC, MMC Gamuda KVMRT (T) Sdn Bhd

Sent:

02/07/2024 11:10:59 AM HKT (GMT +08:00)

Reason:

For Review

Attribute 1:

UNGW - Under Ground Works

Attribute 2:

OVPR - Overall Project

Status:

Outstanding

Response:

Respond by Tuesday, 9 July 2024

Subject:

Re: CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT

 

Uploaded Document

Document No.

Revision

Title

Status

SSP-AECM-UNGW-OVPR-DRR-02552 

01 

DRR - CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT 

Code 2 - Accepted with Comments 

Your document register has been automatically updated with these revisions.

This is an automatic notification from Aconex .

Aconex
Project success. Easy as Aconex.

This email is automatically generated by Aconex.
If you would like to turn off email messages, log into Aconex and edit your "Notifications" user preferences.

If you need assistance, please contact our Oracle Support.

Regards,
The Aconex Team

This email and any attachments are confidential, subject to copyright and may be privileged. No confidentiality or privilege is lost by an erroneous transmission. If you have received this email in error, please let us know by reply email and delete or destroy this email and all copies. If you are not the intended recipient of this email you must not disseminate, copy or use the information in it.

 

Chee, Sek Fong Vincent

unread,
Oct 23, 2024, 9:37:00 PM10/23/24
to Shawana (shawana@zaidun-leeng.com.my), zlmrt...@googlegroups.com

Hi Shawana,

 

Please find attached revised report from MGKT. Can you check if this is sufficient for Code 1 please. Then I will request MGKT to transmit officially in Aconex.

 

Many thanks,

Vincent

 

 

From: Kumaravelan A/L Mayavan <MKumar...@kvmrt-ug.com.my>
Sent: Thursday, October 24, 2024 9:16 AM
To: Chung Joo Ling <JLC...@mgjv-kvmrt.com.my>; Peter Goh Khoon Yaw <pete...@kvmrt-ug.com.my>; Chee, Sek Fong Vincent <Vincen...@aecom.com>
Cc: Wan Nur Intan Suraya Binti Ahmad <WNIS...@kvmrt-ug.com.my>; Rahimee Bin Musa <Rah...@kvmrt-ug.com.my>; Mohammad Azim Bin Mohd Nasir <Mohamm...@kvmrt-ug.com.my>; Manivannan a/l Murugiah <MMani...@kvmrt-ug.com.my>; Mohd Asfahani Bin Sukiman <mohdas...@kvmrt-ug.com.my>; Navindran A/L Andiappen <Navi...@kvmrt-ug.com.my>; Tony Joseph <TonyJ...@gamuda.com.my>
Subject: RE: SSP-MGKT-TRANSMIT-058770: Re: CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT

 

Thanks, Joo Ling for the updated report. Hi Vincent, Please find the advance copy of Rev03 for your advance review. Appreciate it if you could confirm that the revised report is sufficient for Code 1. Thanks. Regards, Kumaravelan A/L Mayavan

Thanks, Joo Ling for the updated report.

 

Hi Vincent,

Please find the advance copy of Rev03 for your advance review. Appreciate it if you could confirm that the revised report is sufficient for Code 1. Thanks.

 

Regards,

Kumaravelan A/L Mayavan
Senior Manager - Quality Assurance/ Quality Control
Quality Assurance/Quality Control Department

Image removed by sender.

CONFIDENTIALITY NOTICE:
This email message is for the sole use of the intended recipient (s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is strictly prohibited. If you are not the intended recipient, contact the sender via email reply and destroy all copies of the original message.

From: Chung Joo Ling <JLC...@mgjv-kvmrt.com.my>
Sent: Thursday, 24 October, 2024 8:53 AM
To: Peter Goh Khoon Yaw <pete...@kvmrt-ug.com.my>; Kumaravelan A/L Mayavan <MKumar...@kvmrt-ug.com.my>; Chee, Sek Fong Vincent <Vincen...@aecom.com>
Cc: Wan Nur Intan Suraya Binti Ahmad <WNIS...@kvmrt-ug.com.my>; Rahimee Bin Musa <Rah...@kvmrt-ug.com.my>; Mohammad Azim Bin Mohd Nasir <Mohamm...@kvmrt-ug.com.my>; Manivannan a/l Murugiah <MMani...@kvmrt-ug.com.my>; Mohd Asfahani Bin Sukiman <mohdas...@kvmrt-ug.com.my>
Subject: RE: SSP-MGKT-TRANSMIT-058770: Re: CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT

 

Morning Kumar,

 

Attached updated report.

 

Regards

Chung Joo Ling
BIM Manager
DID: 03-7494 2302


Image removed by sender.
Image removed by sender.

Integrity, Take Ownership, Teamwork, Develop People, Intellectual Humility.

From: Peter Goh Khoon Yaw <pete...@kvmrt-ug.com.my>
Sent: Tuesday, 22 October, 2024 12:27 PM
To: Kumaravelan A/L Mayavan <MKumar...@kvmrt-ug.com.my>; Chee, Sek Fong Vincent <Vincen...@aecom.com>; Chung Joo Ling <JLC...@mgjv-kvmrt.com.my>
Cc: Wan Nur Intan Suraya Binti Ahmad <WNIS...@kvmrt-ug.com.my>; Rahimee Bin Musa <Rah...@kvmrt-ug.com.my>; Mohammad Azim Bin Mohd Nasir <Mohamm...@kvmrt-ug.com.my>; Manivannan a/l Murugiah <MMani...@kvmrt-ug.com.my>; Mohd Asfahani Bin Sukiman <mohdas...@kvmrt-ug.com.my>
Subject: RE: SSP-MGKT-TRANSMIT-058770: Re: CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT

 

Kumar,

 

Joo Ling had taken over from Rahimee

 

 

Hi Joo Ling,

Appreciate you can do the minor update to the below mentioned report

 

Thanks

Peter

 

-------- Original message --------

From: Kumaravelan A/L Mayavan <MKumar...@kvmrt-ug.com.my>

Date: 22/10/2024 11:04 am (GMT+08:00)

To: "Chee, Sek Fong Vincent" <Vincen...@aecom.com>, Peter Goh Khoon Yaw <pete...@kvmrt-ug.com.my>

Cc: Wan Nur Intan Suraya Binti Ahmad <WNIS...@kvmrt-ug.com.my>, Rahimee Bin Musa <Rah...@kvmrt-ug.com.my>, Mohammad Azim Bin Mohd Nasir <Mohamm...@kvmrt-ug.com.my>, Manivannan a/l Murugiah <MMani...@kvmrt-ug.com.my>, Mohd Asfahani Bin Sukiman <mohdas...@kvmrt-ug.com.my>

Subject: RE: SSP-MGKT-TRANSMIT-058770: Re: CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT

 

Hi Peter,

 

Do we still have anyone to update this report? Is Rahimee still with us?

 

Regards,

Kumaravelan A/L Mayavan
Senior Manager - Quality Assurance/ Quality Control
Quality Assurance/Quality Control Department

Image removed by sender.

CONFIDENTIALITY NOTICE:
This email message is for the sole use of the intended recipient (s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is strictly prohibited. If you are not the intended recipient, contact the sender via email reply and destroy all copies of the original message.

From: Chee, Sek Fong Vincent <Vincen...@aecom.com>
Sent: Tuesday, 22 October, 2024 10:47 AM
To: Kumaravelan A/L Mayavan <MKumar...@kvmrt-ug.com.my>; Peter Goh Khoon Yaw <pete...@kvmrt-ug.com.my>
Cc: Wan Nur Intan Suraya Binti Ahmad <WNIS...@kvmrt-ug.com.my>; Rahimee Bin Musa <Rah...@kvmrt-ug.com.my>; Mohammad Azim Bin Mohd Nasir <Mohamm...@kvmrt-ug.com.my>; Manivannan a/l Murugiah <MMani...@kvmrt-ug.com.my>; Mohd Asfahani Bin Sukiman <mohdas...@kvmrt-ug.com.my>
Subject: RE: SSP-MGKT-TRANSMIT-058770: Re: CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT

 

Hi Kumar,

 

Currently this DRR is still a Code 2 because DDC have updated the model to Rev X05 after the CLYS issue have been resolved recently.

 

MGKT needs to update the report to revise the SSP-AECM-UNGW-CLYS-CNS-3DM-000004 to Rev X05. Subsequently this comment can be closed to Code 1.

 

Regards,

Vincent

 

 

From: Kumaravelan A/L Mayavan <MKumar...@kvmrt-ug.com.my>
Sent: Tuesday, October 22, 2024 7:58 AM
To: Chee, Sek Fong Vincent <Vincen...@aecom.com>; Peter Goh Khoon Yaw <pete...@kvmrt-ug.com.my>
Cc: Wan Nur Intan Suraya Binti Ahmad <WNIS...@kvmrt-ug.com.my>; Rahimee Bin Musa <Rah...@kvmrt-ug.com.my>; Mohammad Azim Bin Mohd Nasir <Mohamm...@kvmrt-ug.com.my>; Manivannan a/l Murugiah <MMani...@kvmrt-ug.com.my>; Mohd Asfahani Bin Sukiman <mohdas...@kvmrt-ug.com.my>
Subject: RE: SSP-MGKT-TRANSMIT-058770: Re: CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT

 

Hi Vincent, Thanks for the update. May I know why it is still issued with Code 2 although the outstanding items have been resolved? We need to close-out this report amicably among us in order to submit to MRTC and close-out this item in CMGD

 

Hi Vincent,

 

Thanks for the update. May I know why it is still issued with Code 2 although the outstanding items have been resolved?

 

We need to close-out this report amicably among us in order to submit to MRTC and close-out this item in CMGD list as well.

Hence, please advice the way forward. Thanks.

 

Regards,

Kumaravelan A/L Mayavan
Senior Manager - Quality Assurance/ Quality Control
Quality Assurance/Quality Control Department

Image removed by sender.

CONFIDENTIALITY NOTICE:
This email message is for the sole use of the intended recipient (s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is strictly prohibited. If you are not the intended recipient, contact the sender via email reply and destroy all copies of the original message.

From: Chee, Sek Fong Vincent <Vincen...@aecom.com>
Sent: Monday, 21 October, 2024 11:11 AM
To: Kumaravelan A/L Mayavan <MKumar...@kvmrt-ug.com.my>; Peter Goh Khoon Yaw <pete...@kvmrt-ug.com.my>
Cc: Wan Nur Intan Suraya Binti Ahmad <WNIS...@kvmrt-ug.com.my>; Rahimee Bin Musa <Rah...@kvmrt-ug.com.my>; Mohammad Azim Bin Mohd Nasir <Mohamm...@kvmrt-ug.com.my>; Manivannan a/l Murugiah <MMani...@kvmrt-ug.com.my>; Mohd Asfahani Bin Sukiman <mohdas...@kvmrt-ug.com.my>
Subject: RE: SSP-MGKT-TRANSMIT-058770: Re: CIVIL AND STRUCTURAL MODELS, ARCHITECTURAL, MEP, TUNNEL WORKS AND TUNNEL MEP DELIVERABLES REPORT

 

Dear Kumar/ Peter,

 

We have responded to this DRR on 17/10/2024. Please refer to transmittal SSP-AECM-TRANSMIT-020608.

 

The updated model is shared with MGKT in Aconex. We did not upload into Projectwise as per your instructions.

 

Regards,

BIM Deliverabls Report-OVPR-REP-00904-Rev03.pdf