Chee, Sek Fong Vincent

unread,
Dec 12, 2024, 1:23:25 AM12/12/24
to Shawana (shawana@zaidun-leeng.com.my), Mohd Fauzi, an...@zaidun-leeng.com.my, zlmrt...@googlegroups.com, Manuel, Carolina

Dear ZL,

 

Please provide your time required and fees for preparation of As-builts for CLYS PRV chamber and bulkmeter relocation by filling out the table below.

 

CLYS

ARE (Days)

ARE (Fees)

Drafter (Days)

Drafter (Fees)

Site Visit

 

 

 

 

ACP Drawings Markup/ Preparation

 

 

 

 

Review/ Checking

 

 

 

 

Respond to ARS

 

 

 

 

Pre-SONO Preparation and Submission

 

 

 

 

Total

 

 

 

 

 

Many thanks,

Vincent

 

Chee, Sek Fong Vincent

unread,
Dec 15, 2024, 9:44:24 PM12/15/24
to Shawana (shawana@zaidun-leeng.com.my), Mohd Fauzi, an...@zaidun-leeng.com.my, zlmrt...@googlegroups.com, Manuel, Carolina

Dear ZL,

 

Can I get your input for this please.

 

Also, what is the status at site now?

 

Regards,

Vincent

Anuar Aris

unread,
Dec 17, 2024, 1:38:38 AM12/17/24
to Vincen...@aecom.com, sha...@zaidun-leeng.com.my, fauzi...@zaidun-leeng.com.my, zlmrt...@googlegroups.com, Carolin...@aecom.com

Dear Vincent,

The time and fees are as below.

The fees is RM13,000

Transportation and other reimbursable Lump Sum RM2,000

Total : RM15,000 Excluding SST.

Thanks


On 12/12/2024 2:23 PM, 'Chee, Sek Fong Vincent' via ZLMRT DDC7 wrote:

Dear ZL,

 

Please provide your time required and fees for preparation of As-builts for CLYS PRV chamber and bulkmeter relocation by filling out the table below.

 

CLYS

ARE (Days)

ARE (Fees)

Drafter (Days)

Drafter (Fees)

Site Visit

 2

   1400

 

 

ACP Drawings Markup/ Preparation

 4

   2800

3

1500

Review/ Checking

 3

   2100

 

 

Respond to ARS

 3

   2100

 

 

Pre-SONO Preparation and Submission

 3

   2100

 2

 1000

Total

 15

 10500

 5

 2500

 

Many thanks,

Vincent

 

--
You received this message because you are subscribed to the Google Groups "ZLMRT DDC7" group.
To unsubscribe from this group and stop receiving emails from it, send an email to zlmrt-ddc7+...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/zlmrt-ddc7/SA1PR12MB567034309679D7C6E3EF51BC983F2%40SA1PR12MB5670.namprd12.prod.outlook.com.


Virus-free.www.avg.com

Chee, Sek Fong Vincent

unread,
Dec 18, 2024, 1:44:20 AM12/18/24
to Anuar Aris, sha...@zaidun-leeng.com.my, fauzi...@zaidun-leeng.com.my, zlmrt...@googlegroups.com, Manuel, Carolina

Dear Anuar,

 

MGKT has rejected your proposed fees because it is too high.

 

Previously, we also did a similar As-Built preparation for BMNS Oil Interceptor relocation (3nos. as-built drawings) and our man-hours are as below, which was approved by MGKT. They have requested for ZL’s time for CLYS to be roughly similar to this BMNS.

 

Can you review and resend your time please.

 

BMNS

ARE (Days)

Drafter (Days)

Site visit

0.5

 

ACP Drawings markup/ preparation

0.5

1

Review/Checking

1

 

Respond to ARS

1

 

Pre SONO preparation

1

 

Total

4

1

 

Many thanks,

Vincent

 

 

From: Anuar Aris <an...@zaidun-leeng.com.my>

Sent: Tuesday, December 17, 2024 2:39 PM
To: Chee, Sek Fong Vincent <Vincen...@aecom.com>; sha...@zaidun-leeng.com.my; fauzi...@zaidun-leeng.com.my; zlmrt...@googlegroups.com
Cc: Manuel, Carolina <Carolin...@aecom.com>

 

Image removed by sender.

Virus-free.www.avg.com

 

Anuar Aris

unread,
Dec 18, 2024, 3:58:10 AM12/18/24
to Vincen...@aecom.com, sha...@zaidun-leeng.com.my, fauzi...@zaidun-leeng.com.my, zlmrt...@googlegroups.com, Carolin...@aecom.com

Dear Vincent,

Is the scope for BMS Oil Interceptor relocation similar as our PRV relocation? Apart from as built preparation there are lots of time spent on resubmission and liaison with authorities including DBKL and Developer PHB to get approval.  

Unless we can submit separate claim for works prior to preparing As Built.

Thanks

Chee, Sek Fong Vincent

unread,
Dec 18, 2024, 10:53:34 PM12/18/24
to Anuar Aris, sha...@zaidun-leeng.com.my, fauzi...@zaidun-leeng.com.my, zlmrt...@googlegroups.com, Manuel, Carolina

Dear Anuar,

 

Noted on your authority submissions and approval.

 

The BMNS example I gave below is only for As-built preparation process from ACP, ARS and Pre-SONO. MGKT is looking at roughly the same hours for CLYS As-built preparation.

 

For Authority submisisions - can you detail the hours for Authority liaison, resubmissions and approvals, etc (separate from your As-built preparation).

 

Please review the number of hours and try to reduce.

 

Regards,

Vincent

 

 

From: Anuar Aris <an...@zaidun-leeng.com.my>
Sent: Wednesday, December 18, 2024 4:58 PM
To: Chee, Sek Fong Vincent <Vincen...@aecom.com>; sha...@zaidun-leeng.com.my; fauzi...@zaidun-leeng.com.my; zlmrt...@googlegroups.com
Cc: Manuel, Carolina <Carolin...@aecom.com>
Subject: Re: As-built Preparation - CLYS - PRV Chamber and Bulkmeter Relocation

 

Dear Vincent, Is the scope for BMS Oil Interceptor relocation similar as our PRV relocation? Apart from as built preparation there are lots of time spent on resubmission and liaison with authorities including DBKL and Developer PHB to get approval. 

Chee, Sek Fong Vincent

unread,
Jan 2, 2025, 8:40:10 PM1/2/25
to Anuar Aris, sha...@zaidun-leeng.com.my, fauzi...@zaidun-leeng.com.my, zlmrt...@googlegroups.com, Manuel, Carolina

Dear Anuar,

 

Happy New Year!

 

Do you have any update on the below please?

 

Many thanks,

Vincent

Chee, Sek Fong Vincent

unread,
Jan 2, 2025, 9:18:30 PM1/2/25
to Anuar Aris, sha...@zaidun-leeng.com.my, fauzi...@zaidun-leeng.com.my, zlmrt...@googlegroups.com, Manuel, Carolina

Dear Anuar,

 

I have just received MGKT’s review of your CLYS fees for your further action please.

 

Many thanks,

Vincent

 

 

From: Teoh Soo Keat @ Chang Soo Cheak <SKT...@gamuda.com.my>

Sent: Friday, January 3, 2025 10:10 AM
To: Chee, Sek Fong Vincent <Vincen...@aecom.com>

Cc: Ravichanthiran <Ra...@gamuda.com.my>; Peter Goh Khoon Yaw (UGJV) <pete...@kvmrt-ug.com.my>; Khor Gao Quan <gaoqua...@gamuda.com.my>; Kumaravelan A/L Mayavan (UGJV) <mkumar...@kvmrt-ug.com.my>
Subject: FW: As-built Preparation - CLYS - PRV Chamber and Bulkmeter Relocation

 

Dear Vincent, Please find our review for ZL’s fee for your consideration. CLYS ARE (Days) ARE (Fees) Drafter (Days) Drafter (Fees) ZL Propose ZL Propose ZL Propose ZL Propose Site Visit 2 1 1400 700 ACP Drawings Markup/ Preparation 4 2

Dear Vincent,

 

Please find our review for ZL’s fee for your consideration.

 

CLYS

ARE (Days)

ARE (Fees)

Drafter (Days)

Drafter (Fees)

ZL

Propose

ZL

Propose

ZL

Propose

ZL

Propose

Site Visit

2

1

1400

700

 

 

 

 

ACP Drawings Markup/ Preparation

4

2

2800

1400

3

2

1500

1000

Review/ Checking

3

1

2100

700

 

 

 

 

Respond to ARS

3

2

2100

1400

 

 

 

 

Pre-SONO Preparation and Submission

3

2

2100

1400

2

2

1000

1000

Sub Total

15

8

10500

5600

 5

4

 2500

2000

Total

MYR 7,600

 

Regards,

Teoh Soo Keat
Manager - Design & Technical
Design & Technical Department






Image removed by sender.

CONFIDENTIALITY NOTICE:
This email message is for the sole use of the intended recipient (s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is strictly prohibited. If you are not the intended recipient, contact the sender via email reply and destroy all copies of the original message.

from your inbox. If you have any issues, please contact g...@gamuda.com.my.

 

Disclaimer Note: This e-mail transmission may contain confidential or legally privileged information that is intended only for the individual or entity named in the e-mail address. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this e-mail is strictly prohibited. If you have received this e-mail transmission in error, please reply to the sender, so that we can arrange for proper delivery, and then please delete the message from your inbox. If you have any issues, please contact g...@gamuda.com.my.

CLYS PRV Chamber Relocation_ACP.xlsx

Anuar Aris

unread,
Jan 7, 2025, 3:02:36 AM1/7/25
to Vincen...@aecom.com, sha...@zaidun-leeng.com.my, fauzi...@zaidun-leeng.com.my, zlmrt...@googlegroups.com, Carolin...@aecom.com

Dear Vincent,

My counter proposal is as follows:-

Lump sum @ 20% discounted fees of RM13000 x 0.8 = RM10,400

Reimbursement for traveling etc : RM 600.00

Total excl SST: RM11,000.00

Thank you.
Anuar

Anuar Aris

unread,
Jan 7, 2025, 4:48:49 AM1/7/25
to Vincen...@aecom.com, sha...@zaidun-leeng.com.my, fauzi...@zaidun-leeng.com.my, zlmrt...@googlegroups.com, Carolin...@aecom.com

Dear Vincent,

My counter proposal is as follows:-

Lump sum @ 20% discounted fees of RM13000 x 0.8 = RM10,400

Reimbursement for traveling etc : RM 600.00

Total excl SST: RM11,000.00

Thank you.
Anuar


Virus-free.www.avg.com

Chee, Sek Fong Vincent

unread,
Jan 7, 2025, 8:21:09 PM1/7/25
to Anuar Aris, sha...@zaidun-leeng.com.my, fauzi...@zaidun-leeng.com.my, zlmrt...@googlegroups.com, Manuel, Carolina, saf...@ceci.com.tw

Dear Anuar,

 

As discussed with MGKT, your scope of works should cover all the below. If this can be agreed, we can proceed further.

 

  1. Site visit
  2. Preparation of drawings – ACP & ABD
  3. Reply for ARS & amendments until SONO
  4. PE endorsement for ABD (A3 & A1)
  5. Provision of soft copy (ACAD & PDF for printing of A1 drawings)
  6. All necessary Authority submissions and approvals.

 

Please let me know if this is agreeable with you.

 

Many thanks,

Vincent

 

 

From: Anuar Aris <an...@zaidun-leeng.com.my>
Sent: Tuesday, January 7, 2025 4:03 PM
To: Chee, Sek Fong Vincent <Vincen...@aecom.com>; sha...@zaidun-leeng.com.my; fauzi...@zaidun-leeng.com.my; zlmrt...@googlegroups.com
Cc: Manuel, Carolina <Carolin...@aecom.com>
Subject: Re: As-built Preparation - CLYS - PRV Chamber and Bulkmeter Relocation

 

Dear Vincent, My counter proposal is as follows: - Lump sum @ 20% discounted fees of RM13000 x 0. 8 = RM10,400 Reimbursement for traveling etc : RM 600. 00 Total excl SST: RM11,000. 00 Thank you. Anuar On 18/12/2024 2: 44 PM, Chee, Sek Fong Vincent