2013 Robot Progress

4 views
Skip to first unread message

Ryan Quellet

unread,
Jan 25, 2013, 1:24:31 AM1/25/13
to bob85-...@googlegroups.com, zeeland-firs...@googlegroups.com, Hilda Westrate
All,

Attached is an eDrawing of the robot in it's current unfinished state.  Download eDrawings from: 

Inline image 1 Inline image 2

Design Team: 
- Do not work directly in Dropbox (otherwise complete chaos ensues...), instead, copy the data to your desktop, work on it, and then copy it back to dropbox with a different folder name (usually the current date)
- Use the following folder name / date structure <YEAR>.<MONTH>.<DAY>_DESCRIPTION.  Ex: for January, 25th 2013: 2013.01.25_Robot.  This helps with file explorer sorting.
- The most current merged Robot data is: <Dropbox>\2013 - FRC85\2013.01.25_Robot\

Regards,

Ryan Quellet
2013.01.25_Robot_Climb.PNG
2013.01.25_Robot.PNG
2013_000.EASM
2013.01.25_Robot.PNG
2013.01.25_Robot_Climb.PNG

Ryan Quellet

unread,
Feb 1, 2013, 2:01:46 AM2/1/13
to bob85-...@googlegroups.com, zeeland-firs...@googlegroups.com, Hilda Westrate
All,

As requested, attached is an eDrawing of the robot so far.
Inline image 1 Inline image 2

The second picture shows that we should be able to shoot through the pyramid in autonomous (and during the match).  So, hopefully, no driving will be required in autonomous!

I've also added servo stoppers to the hopper.  This should allow the programming team to better control the flow of frisbee's into the shooter and make sure that frisbee's do not fall out of the hopper during our ascent.

Let me know if there are any questions,

Ryan Quellet
--

2013.01.25_Robot_Climb.PNG
2013.01.25_Robot.PNG
2013.02.01_ISO.PNG
2013.02.01_Field_Configs.PNG
2013.02.01_Field_Configs.PNG
2013.02.01_ISO.PNG
2013.02.01_ISO_rear.PNG
Reply all
Reply to author
Forward
0 new messages