The Urbanist
KEYWORD SCORE: 22.28. construction, downtown, house, occupancy, parking, project, transportation, urban, walk, zone
The Washington State Department of Transportation (WSDOT) is in the midst of repairing and resurfacing the I-5 upper bridge deck — replacing aging concrete and expansion joints, improving drainage, and addressing other long-deferred maintenance. With this work has come gridlock, heightened driver stress and aggression, and a collective “grit and bear it” approach to traveling in and through Seattle. The impacts are everywhere. Travel times on I-5 north and south have ballooned. City streets are clogged with drivers inching toward on-ramps. And that congestion is spilling over into increasingly
Share via: