Evenif you work with stamped drawings, you'll eventually need to do commercial load calculations in the field or on a licensing exam. The National Electrical Code (NEC) covers commercial calculations in Art. 220, but other Articles also apply. For example, you must know the definitions in Art. 100, be familiar with what Art. 210 says about continuous loads, and understand the overcurrent protection requirements set forth in Art. 240.

Dryers. Size the branch-circuit conductors and overcurrent protection device for commercial dryers to the appliance nameplate rating. Calculate the feeder demand load for dryers at 100% of the appliance rating. If the dryers run continuously, you must size the conductor and protection device at 125% of the load [210.19(A), 215.3, and 230.42]. Table 220.18 demand factors don't apply to commercial dryers.


Let's apply what we've just learned. What size branch-circuit conductor and overcurrent protection does the NEC require for a 7kW dryer rated 240V when the dryer is in a multi-family dwelling laundry room (Fig. 2)?


Electric heat [424.3(B)]. Size branch-circuit conductors and the overcurrent protection device for electric heating to not less than 125% of the total heating load, including blower motors. Calculate the feeder/service demand load for electric heating equipment at 100% of the total heating load.


To determine the service demand load for commercial kitchen equipment that has thermostatic control or intermittent use, apply the demand factors from Table 220.20 to the total connected kitchen equipment load. The feeder or service demand load can't be less than the sum of the two largest appliance loads. The demand factors of Table 220.20 don't apply to space-heating, ventilating, or air-conditioning equipment.


Lighting. The NEC requires a minimum load per square foot for general lighting, depending on the type of occupancy [Table 220.3(A)]. For the guestrooms of hotels, motels, hospitals, and storage warehouses, you can apply the general lighting demand factors of Table 220.11 to the general lighting load.


Assume the general lighting load for commercial occupancies other than guestrooms of motels, hotels, hospitals, and storage warehouses is continuous. Calculate it at 125% of the general lighting load listed in Table 220.3(A).


Multi-outlet receptacle assembly. For service calculations, consider every 5 feet (or less) of multi-outlet receptacle assembly to be 180VA. When you can reasonably expect a multi-outlet receptacle assembly to power several appliances simultaneously, consider each foot (or less) as 180VA for service calculations. Normally, a multi-outlet receptacle assembly isn't a continuous load [220.3(B)(8)].


Number of receptacles permitted on a circuit. The maximum number of receptacle outlets permitted on a commercial or industrial circuit depends on the circuit ampacity. To calculate that number, divide the VA rating of the circuit by 180VA for each receptacle strap.


Bank and office general lighting and receptacles. Calculate the receptacle demand load at 180VA for each receptacle strap [220.3(B)(9)] if the number of receptacles is known, or 1VA for each square foot if the number of receptacles is unknown [Table 220.3(A) Note b].


The NEC requires each commercial occupancy that's accessible to pedestrians to have at least one 20A branch circuit for a sign [600.5(A)]. The load for the required exterior signs or outline lighting must be at least 1,200VA [220.3(B)(6)]. A sign outlet is a continuous load. You must size the feeder load at 125% of the continuous load [215.2(A)(1) and 230.42].


In addition, you can't reduce the neutral demand load for nonlinear loads supplied from a 3-phase, 4-wire, wye-connected system, because they produce triplen harmonic currents that add on the neutral conductor. This situation can require the neutral conductor to be larger than the ungrounded conductor load (220.22 FPN 2).


Knowing the correct way to do commercial load calculations makes you more valuable because you can play a key role in the field design, inspection, and implementation process. It's one more skill that helps you do the job right the first time.


A permit is required for the installation of an EV charger other than those that connect to an existing 15 or 20 ampere, 120-volt receptacle (i.e. Level 1 charger). Permit submittal requirements are outlined in the following documents:


The required application pages and a blank electrical load calculation worksheet can be found near the bottom of our Applications and Forms page under the "Fillable Permit Applications" heading. Failure to include all required information will delay the review and approval process.


All work must comply with the 2005 National Electrical Code, as amended by the Village of Wilmette.



For additional information on electric vehicles, please check out our Electric Vehicle Readiness page.


The residential load calculation worksheet calculates the electrical demand load in accordance with Article 220 of the 2017 National Electrical Code. The worksheet helps to provide an accurate, consistent, and simplified method of determining the minimum size electrical service for a new or existing dwelling looking to add additional electrical load.


Commercial electrical load calculations are important to determine the electricity needs of a building. As such, you can reduce energy consumption hence reducing electricity bills. This article provides a guide on how to calculate the electrical load of your building.


An electric load is a device that consumes electrical energy, converting it into another form of energy, such as heat, light or motion. Some examples of electric loads include light bulbs, electric motors, and office equipment such as computers and printers.


To determine how much power can support the energy needs of your building, you need commercial electrical load calculations. Tercero is a leading commercial electrical contractor who can help determine your needed power. If you need these services, feel free to contact us.


There are many different types of commercial electric loads, which can vary depending on the specific needs of the building. Understanding these electric loads and their characteristics is important for managing and maintaining the electrical system in a commercial building.


To calculate the commercial electric load, you would need to measure the current and voltage of each electric load in the commercial building and then use the formula P = VI to calculate the power consumption of each load.


To calculate the commercial electric load, you would first use the formula P = VI to calculate the power consumption of each electric load. For electric load 1, the power consumption would be 5 amps * 120 volts = 600 watts.


Next, you would simply add up the power consumption of each electric load to get the total commercial electric load. In this case, the total commercial electric load would be 600 watts + 480 watts + 120 watts = 1,200 watts. This is the total amount of electricity that the commercial building consumes.


While it is theoretically possible for someone who is not an electrician to calculate the commercial electric load, it is generally recommended that an electrician be hired to perform this task. There are several reasons for this, including the following:


Another option is to use specialized electrical load calculation software. This type of software is specifically designed for calculating electrical loads and often includes features such as pre-populated electrical equipment databases and the ability to input and edit data easily.


In short, specialized software for commercial electrical load calculations can help ensure that the calculations are comprehensive, efficient, and accurate. It can enable you to ensure the electrical system meets the power demands of your commercial building.


Calculating commercial electrical load is as easy as following the above formula. The best part? There is specialized software for this, and you can consult a professional electrician. If you need commercial electrical load calculations, Tercero is a perfect choice. Call us to book a consultation.


We also use third-party cookies that help us analyze how you use this website, store your preferences, and provide the content and advertisements that are relevant to you. These cookies will only be stored in your browser with your prior consent.


Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.


Maintenance Notice: ACCA will be undergoing scheduled site updates on Monday, July 29, 2024, starting at approximately 5:30 PM EST. The website will be inaccessible for the duration of the evening. We advise against placing any orders during this time. Thank you for your understanding.


The New 5th Edition of Manual N greatly improves on the capabilities, sensitivities, and information provided in previous editions. The New 5th Edition also provides (N5ae), an abridged version that supports hand calculations for the N5 subset of applications and procedures.


Part 3 - Tables

Part 3 contains a wide variety of tables to give input to worksheets and equations involved in load calculations procedures. Specific tables include many aspects of load calculation, including but not limited to:


Part 4 - Related Guidance and Information

Part 4 contains basic guidance and guidelines for relevant information regarding commercial load calculation. Appendices eleven through eighteen are for the full version of Manual N, featuring advanced topics for high-level practitioners, advanced-course instructors, and software programmers. Information included in Part 4 include but are not limited to:


ACCA Speed-Sheets are Excel spreadsheets available for purchase that can be used in conjunction with ACCA Technical Manuals, which assist in learning important system design concepts. Speed-Sheets are not a replacement for the full Technical Manual, and are not a replacement for ACCA-approved software.

3a8082e126
Reply all
Reply to author
Forward
0 new messages