Baliradam Wind Turbines Were Refused By The West Planning Committee Today
14/00008/EIA | Erection of eleven wind turbines with maximum height of 115 metres to tip with formation of associated hardstanding, site access, new access tracks, substation, construction compound, control building compound, cabling, and anemometry mast | Blairadam Forest Kelty Fife
Regards
Hamish