You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to wind-turbine-d...@googlegroups.com
02/03/2015
Page 32 Ward: The Lochs Application Determined 12/02053/FULL | Erection of wind turbine (45.9m high to tip) and associated infrastructure including access track, crane hard standing and control building | Intelligent Land Investments, Mr Andrew Hughes, Lathalmond Farm Dunfermline Fife KY12 0SD http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=M4F5ARHFT8000
Application Refused
09/03/2015
Page 37
Ward: The Lochs
Application Determined
14/00708/FULL | Erection of 2 wind turbines (35 metres to blade tip) with associated infrastructure and access track | Lochend Farm Colton Dunfermline Fife KY12 0RY