Weekly Update of Development Applications
Page 19
Ward: Glenrothes And West Kinglassie
Application Registered
14/03919/SCR | Screening opinion for erection of one 800kW wind turbine (78m maximum tip height) | Land At Kinninmonth Farm Fife
Page 21
Ward: Howe Of Fife And Tay Coast
Application Registered
14/03879/SCR | Erection of single 500kW wind turbine (maximum 77m high to blade tip with 54m maximum blade diameter) | Devon Wood Devon Farm Devon Star Fife
Page 36
Ward: West Fife And Coastal Villages
Application Registered
14/03005/FULL | Erection of one 5kW wind turbine (17.75 metres to blade tip) including ancillary works | Land 300M West Of Bents Farmhouse Upper Steelend Fife
Regards
Hamish Park