Weekly meeting summary

0 views
Skip to first unread message

Ian Sullivan

unread,
Aug 30, 2012, 11:40:32 AM8/30/12
to wiki...@googlegroups.com
1 Indian org cooperation
=========================
Still finalizing MOU, waiting on Ian for drafting.

2 NY Workshop PR
=================
Waiting on feedback from Laurent, Jim, Matt @ Adelphi. Will get blog
post up Friday.

3 odesk update
===============
Talking to two of the previous contributors about building
collections of lessons. Wish to try both of them our during Sept to test
for longer term work and so we have the most material available for the
Oct workshop.

4 Kids on Computers partnering
===============================
Email from Ian pending.

5 P2PU and public material building documentation
==================================================
Materials discussed last week still waiting on Ian's time to get up.

6 Visual editor
================
Laurent:

- CSS is fixed as we wanted, so the toolbar stays at the top, right
from page load, which makes it a lot more obvious that we're in editing
mode.
- Backend html validation works, though it needs fixing a "bug" that we
discussed with Jim.
- creole pages are automatically updated to html now
- Working on the the wikilink plugin now. I still have a weird
interaction with the standard link plugin which I'm trying to resolve.

This is an annoying bug, but not necessarily a blocking one, we can
simply rely on standard links for internal links for now if we're in a
hurry. I asked for help on this with the aloha team. I've had 3
different suggestions, will try to implement them and let you know.

Will work to finish up our visual editor deploy on dev box over the next
week.

7 Re-ordering rows in lesson editor
====================================
Laurent: I'm looking into #144/178 (reordering FCD rows) right now.
It works
very easily, but our table is so heavy that the browser lags a lot when
moving rows around.

8 Indexing
===========
Patch from last week applied on server. Appears to be working fine.
Next step is a review for consistency before push to master in git.
Should happen over the next week.

9 Tech volunteer planning
==========================
Email update from Jim pending
Reply all
Reply to author
Forward
0 new messages