Hi,
I have a Raspberry Pi running WSL connected via RS485 to a PowerOne 2000 inverter.
The system started energy production September 11, but I only started logging 3rd of October. From 11-09 to 3-10, I produced about 138 kWh. All of this energy is now logged as been produced on 3-10. Is there any way to correct this?
To clarify a bit: I want to manually change the reported daily production to the values I have manually recorded.
I found the instruction on repairing the SQL database using a dump text file, but so far didn't succeed in actually exporting the values to a text file.
Any ideas?
WSL data:

Actual production (Manually added to PVoutput)

Regards,
JanPedaal