From: "Huotari, William (MDOT)" <Huot...@michigan.gov>
Date: August 27, 2025 at 2:05:29 PM EDT
To: eric...@gmail.com
Subject: FW: Public Comment Received on the 5YTP
Eric, thank you for your comments.
The project on I-94, from Ann Arbor/Saline Road to US-23 includes non-motorized facilities.
The scope and schedule of the project is subject to change as we get into detailed design, but as part of that larger effort, the project is anticipated to include:
• Full signalization of the ramp terminals at State Street
• Non-motorized facilities on the State Street Bridge
As this project is a few years in the future, design plans and/or specific details are not available at this time.
If you have additional questions or concerns, please feel free to contact me directly.
Thanks, Bill
William J. Huotari, PE | Projects & Contracts Engineer Manager
Brighton TSC | 10321 E. Grand River, Suite 500 | Brighton, MI 48116
(517) 257-4163 | Huot...@michigan.gov
A comment has been received on a 5 Year Transportation Program project via the Michigan Transportation Program Portal.
Location: I-94 from Ann Arbor/Saline Road to US-23; US-23/I-94 interchange
Job Description: JobID=210997: Additional Lane(s) less than 0.5 mile long
Responsible TSC: Brighton TSC
First Name: Eric
Last Name: Boyd
User Zip Code: 48103
Business or Organization (If Applicable):
Did the commentor indicate they would like a response?: Yes
Email Address:eric...@gmail.com
Comment/Feedback:A safe walking and biking option is desperately needed to cross I94 at State Street on both sides of State Street.
Optional information provided by user:
Comment Type:Safety
User Type:
Biker