The Water Engineering Panel invites you to our next CPD event
Flood Risk to Major Infrastructure3 March
6 pm
Engineers, Australia, Level 31, 600 Bourke St, Melbourne
Please click through for the flyer and to register:
https://www.engineersaustralia.org.au/event/2020/01/flood-risk-major-infrastructureMajor infrastructure projects underway in Melbourne, include the Metro Tunnel, North East Link and the West Gate Tunnel. Given the long design life of these projects, the influence of climate change on flood risk must be considered. At this event guests will hear from the engineers involved in calculating, managing and mitigating flood risk, and learn how designs have been adapted to ensure consistency between projects and the future safety of infrastructure users.
Speakers
Mark Coffey
Melbourne Water
Senior Liaison Manager for Major Infrastructure Projects and Asset Management Services
Ken Tchung
Melbourne Water
Senior Asset Practitioner (Mapping & Modelling) for Flood Information
Simon Engelsen
Cross Yarra Partnership delivering the Metro Rail Tunnel Project
Rob Guest
Cardno
Senior Engineer at Cardno, supporting the analysis and mitigation of flood risk to major infrastructure projects.