Ishanga Life Science Plans to set up 193 Ton/Month Pharma & Intermediate Product unit....,,,,,,,,

32 views
Skip to first unread message

Water Of India

unread,
May 24, 2019, 12:42:29 PM5/24/19
to watero...@googlegroups.com
 Industrial Directory of India.Com 

       Released
             "New Projects This Week" 

                   RELEASED : ISSUE MAY 19 /19 

              Comprising  of  Total  81 New Project Enquiries 

  with Company's Name/ Address/ Phone/ Fax/ Contact person/E-mail 
                (Published Every Week :Electronic Issue) 
          http://www.industrialdirectoryofindia.com/download

FREQUENTLY ASKED QUESTIONS ABOUT PROJECT ENQUERIES

           Visit http://industrialdirectoryofindia.com/FAQ

    (Helpline : +91-900 7158 600) 

                     New Project

 Ishanga Life Science Plans to set up

 193 Ton/Month Pharma & Intermediate Product unit

 ====================================        

 Ishanga Life Science Pvt. Ltd.  plans to set  up a 

Pharma & Intermediate Product manufacturing unit having Capacity of 193 Ton/Month

at Madhvas, Tal : Kalol in Panchmahal District, Gujarat.

 Capacity :  193 Ton/Month    

 

Location :  Madhvas, Tal : Kalol in Panchmahal District, Gujarat.  .

 

**************************************

As on  May 24, 2019 : The Project is under Planning Stage .

 

Total site area is  6378 Sq. Meter.

An area of about  33%   will be developed with green belt.

  

IMPORTANT: As per the the discussion we had

on 15.05.2019 with Ishanga Life Science Pvt. Ltd.  

the Project  is  under Panning Stage.

 

The company is waiting still for Environmental Clearance.


The Project   is Scheduled to be  Completed by

in 12 Months from the date of the commencement

of the project work.

-------------------------------------------------------------------------------

So, this is the RIGHT TIME to contact  and Follow Up at following 

address to obtain the detailed Enquiry of each product  in time and to

submit your quotation subsequently.

 

**************************

The Main Scope of Supply includes

Boiler : 3 TPH  - 1 No.

Fuel   :  Coal ( in case of Non availability  of Bio-Coal)= 7 MT/Day - at 40% of Load     

Heat Exchangers, Air Pre-heater/Economiser)

Wet Scrubber for arresting fly ash

 Air Polution Control:

There will be  flue gas stack and one process gas stack which will be the main emission source from the plant.

Proper Stack height and air pollution control measures  will be provided in order to achieve norms prescribed by statutory authority.

 For Boilers Cyclone &  Bag filter  will be provided

 

Single Stage Scrubber  will be also be provided.

 ************************

Other Equipments:

SS Reactor

Dryer

---------------------------------------------

Chilling Water plant

---------------------------------------------

Cooling Tower  

---------------------------------------------  

Scrubbers(single stage)         

-----------------------------------------------

DM/R.O. plant          

---------------------------------------------

Air Compressor              

----------------------------------------------

Effluent Treatment Plant   

----------------------------------------------

Solvents Pumps (SS/PP)                         

----------------------------------------------

HDPE Storage Tanks             

-----------------------------------------------------

MS/SS Solvent Storage Tanks

-----------------------------------------------------

Weighing Balance 

----------------------------------------------

Fire Hydrant System 

 

**************************

DG sets :  600 KVA1 No.

                                 

For back up in the common areas as well as for essential services

above Two D.G.sets will be installed..

 Water Treatment Plant:

 Pumps, Valves, Custom Pipeline Work, Plumbing Work

 The daily water demand of the proposed project will be around

222 m3/Day.,

 The source of water supply for the project will be from  Bore well and water tankers.

 ************************************************************************

 Details of Water Consumption

1.Domestic                                 : 20  M3/Day

2.Process Water                        :  85  M3/Day

3.Boiler Make up                         : 30  M3/Day

4. Cooling  Tower(make up)    : 40  M3/Day   : ................

5. Gardening                               10  M3/Day

6. Washings                                : 27. M3/Day

7. Other                               :         10  M3/Day

---------------------------------------------------------------------------------------

                       Total:  222 M3/ Day

    ********************************************************

Effluent Treatment Plant:

Capacity : 200 KLD

Reverse Osmosis Plant

 

The company shall adopt and follow an environmental management plan for abatement

of pollution and overall enhancement of the quality of environment in and around the

unit.

About 177 KLD of effluent (wastewater) will be  generated f

rom process and utilities.


The Company will have a full pledged Effluent Treatment Plant (ETP) to treat

the effluent as per the norms.


Part of the treated effluent would be recycled and used for the process.

Part of treated effluent is sent for forced evaporation for final treatment. 


The residuecollected from forced evaporation and solid waste would be stored in HDPE

drums/Bags and disposed to TSDF facility.

FLOW CHART FOR EFFLUENT TREATMENT

HTDS/HCODCollection > Equalization & neutralization >

Stripper > MEE > ATFD > TSDF

MEE Condensate will be Reused


HTDS/HCOD : Collection> Equalization & neutralization >

MEE > ATFD > TSDF

MEE Condensate will be Reused.


LTDS/LCOD :Collection> ETP(Biological Treatment) > Sand

Filter > Carbon Filter >Booster pump to

Membrane Filter set > RO Plant > RO Reject to

MEE RO Permeate to Reused.

 

Other Equipments:

Dosing Systems, Heat Exchangers, Ball Mills, Drum Mixers, Agitators, Pulverizes, Dryers, Solvent Calibration Tank, S S Reaction Vessel  with Stirrer, Gear & Elec. Motor, Holding Vessel, Automatic Filling, Pluging & Capping Machine, Patent Automatic Liquid Filling / Weighing  Machine, AIR Scrubber with hoodes, Hot Water Bath, Semi Automatic Box Strapping Machine,  Heat Shrink Wrapping Machine, Induction Sealing Machine, Water Pumps, Chemical Pumps, Storage Tanks, Water & Acid line Valves, Control Vales, Cooling Towers, Custom Pipeline Work.

 Ventilation & Exhaust System

Complete Laboratory Equipments

Fire fighting System as per TAC norms,

 Green Belt Development plan is  33 %   of  area and a scheme for Rainwater Harvesting have to be put in place.                                         

Scope Of Entire Civil & Construction Work:

Construction of Office Building, Factory  Shed- Boiler House, Substation-Control Panel- Electrical Work, Plumbing Work, Structural Steel fabrication and Erection Work, Fabrication  Storage Tank, Vessels etc. etc.   

 

Companies/ General Industries/ Manufacturers /  Contractors/ Sub Contractors/ Manufacturers of Chemical Plant & Machineries, Water &  Effluent  Treatment Plant , Fire Fighting Equipments, Air-conditioning, Boilers, Air Pollution Control Equipment, Pumps, Motors Valves For Acid line, Pipeline Jobs  for the above project  may  Contact for etc.etc. may  Contact for Specified Enquiry at  :

 

Ishanga Life Science Pvt. Ltd.  

Mahesh Plastic, Plot No. 701/A, GIDC Estate Halol, Panchmahals - 389350, Gujarat, India,

---------------------------------------------------

Tel: +91-2676-223702. Email: maheshpla...@gmail.com


            New Projects

 

**************************************               

         FREQUENTLY ASKED QUESTIONS  ABOUT PROJECT ENQUERIES

                   Visit : http://industrialdirectoryofindia.com/FAQ

      GET NEW PROJECTS INFORMATIONS  ONLINE   

                    http://www.industrialdirectoryofindia.com/download

We provide information on NEW PROJECTS  such as Automobiles,Aviation, Breweries & Distilleries, Biotech,Banking & Finance, Cement,Construction & Machineries,Chemicals,Coal,Dairy,Defence, Drugs & Pharmaceuticals, Engineering, Food Processing,Packaging,Fertilizers, Hospitality & Healthcare,HRD Hotels & Restaurant, Infrastructure, IT, ITES, BPO,KPO, Iron & Steel,Logistic. Metallurgy, Minerals, Mining,Material Handling & Warehousing, Oil & Natural Gas, Paper, Passenger Cars, Polymers, Petrolium,Ports,Pipelines, Power & Transmission, Real Estate,Resort & Tourism,Renewable Energy,Rural Development, Roads & Highways, SEZ, EPZ, Shopping Plazas, Storage & Distribution, Sugar, Textiles,Tyres, Refineries, Transport Equiments, Valves, Vegetable Oils, Water & Waste Water Treatment and many other Industries.

                

                 with all Contact Details:

                 Company's Name

                 Address/ Phone/ Fax

                 Contact person's Name

                 E-mail Id

 

We provide the information of Projects for various stages right from Land Acquisition, Starting Of Civil Work, Vendor Registration & Material Procurement etc. etc. to completion.

 

We make your  Bidding/MARKETING/ Sub-contracting  & Planning MORE EASY

GET YOUR COMPANY REGISTERED TODAY  AND GET ALL PROJECTS INFORMATIONS  DIRECTLY IN YOUR MAIL BOX  .

 

Visit : http://www.industrialdirectoryofindia.com/registration

 

GET ALL  BUYING LEADS FOR YOUR PRODUCT DIRECTLY IN YOUR MAIL BOX

------------------------------------------------------------------------------------------------------------


Reply all
Reply to author
Forward
0 new messages