update on tasks....

Saketh S

unread,
Nov 26, 2013, 11:02:47 AM11/26/13
to Raj V Jain, vyoma_tempo...@googlegroups.com
4.15PM:Reached Workshop
4:45-5:45- Worked on modifying Vyoma report(Adding pie chart, table and scope for future work)
5:45-around 6.30- Helped recitfy mistake made in flight score and then which was causing problem in MDS
6.30-7.15: Continuing actual task, research on PU Foam. Looks challenging.Percentage maybe 5%
7.15-8: Nithan's KSS, very interesting, and little help to vaibhav in Thrust Rig.
Left workshop at 8.30PM.


On Tue, Nov 26, 2013 at 8:43 PM, Raj V Jain <rajja...@gmail.com> wrote:
update on tasks....

--
You received this message because you are subscribed to the Google Groups "Vyoma temporary company" group.
To unsubscribe from this group and stop receiving emails from it, send an email to vyoma_temporary_c...@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.

kiniavinash

unread,
Nov 26, 2013, 12:20:03 PM11/26/13
to vyoma_tempo...@googlegroups.com
Sorted out some problems in MDS.....optimisation by solver is not happening, so gave up that part. Now, trying to design a slow flyer as directed by Anirudh...

On Tuesday, 26 November 2013 20:43:48 UTC+5:30, rajjain4900 wrote:
update on tasks....

Vaibhav Srinivasa

unread,
Nov 26, 2013, 12:28:46 PM11/26/13
to Raj V Jain, vyoma_tempo...@googlegroups.com
7:00- reached Worksop after industrial visit 
7 to 7:45- thrust rig 
7:45 to 8:30 - KSS on Fourier and Laplace transforms by Nithan 
10 to 10:30- research on epp foam 

Vaibhav Srinivasa

unread,
Nov 26, 2013, 12:30:41 PM11/26/13
to Raj V Jain, vyoma_tempo...@googlegroups.com
Update: 
9am to 10:30am-  procurement sheet and epp foam research 

Chetan Vaidya

unread,
Nov 26, 2013, 12:46:51 PM11/26/13
to Vaibhav Srinivasa, Raj V Jain, vyoma_tempo...@googlegroups.com
5 to 6- research on pu foams..(not much progress as speed was less.. then did some work with Bhagat singh..)
6 to 7-sorted some problems with kini on MDS..and got to know the extension of MDS ..
7 to 8:15 nithan raj KSS on control systems ,laplace and fourier transforms

Bhagatsingh Biradar

unread,
Nov 26, 2013, 1:30:50 PM11/26/13
to Chetan Vaidya, Vaibhav Srinivasa, Raj V Jain, vyoma_tempo...@googlegroups.com
5:30 to 7:30 -did research on polyurethane foam,saw videos on fabrication,worked for some time on matlab.
7:30 to 8:15-kss by nithan on fourier transform.

A N Ganesh

unread,
Nov 26, 2013, 1:37:31 PM11/26/13
to Bhagatsingh Biradar, Chetan Vaidya, Vaibhav Srinivasa, Raj V Jain, vyoma_tempo...@googlegroups.com
5:15 to 7:30 wrked on polyburaq with tukal saraf ,and finally completed it.Came back and lil bit researched on Epp foam.Unfortunately missed nithans KSS.


On Wed, Nov 27, 2013 at 12:00 AM, Bhagatsingh Biradar <bhagat...@gmail.com> wrote:
5:30 to 7:30 -did research on polyurethane foam,saw videos on fabrication,worked for some time on matlab.
7:30 to 8:15-kss by nithan on fourier transform.

--

anirudh saraf

unread,
Nov 26, 2013, 2:27:28 PM11/26/13
to Raj V Jain, vyoma_tempo...@googlegroups.com
5-7 30 - worked on poly buraq. its complete now with bulk heads too. 
worked on EPP foam from 8 45 to 9 45
1200 to 12 45- logbook compilation.


On Tuesday, 26 November 2013 8:43 PM, Raj V Jain <rajja...@gmail.com> wrote:
update on tasks....

Mughilan Thiru Ramasamy

unread,
Nov 26, 2013, 2:38:35 PM11/26/13
to anirudh saraf, Raj V Jain, vyoma_tempo...@googlegroups.com
It is interesting to see that all electronics people are 'perennially'  on leave.
--
T.R.Mughilan

Adarsh P R

unread,
Nov 26, 2013, 2:40:32 PM11/26/13
to Raj Jain, vyoma_tempo...@googlegroups.com

Reached workshop at 5:30. Waiting for the arduino n then bootloaded the arduino uploading the new code... Kss from Nithan.. Came back to hostel around 8:00-30. Dunno precise timing

Shishir Patil

unread,
Nov 26, 2013, 3:01:52 PM11/26/13
to trmug...@gmail.com, Raj Jain, vyoma_tempo...@googlegroups.com
bit of bootloading,tested de acclrometer on arduino,shud test it with
lcd,googled a bit on relays,etc.

Shishir Patil

unread,
Nov 26, 2013, 3:05:15 PM11/26/13
to trmug...@gmail.com, Raj Jain, vyoma_tempo...@googlegroups.com
^5.30pm to 8.30pm

Shishir Patil

unread,
Nov 26, 2013, 3:06:27 PM11/26/13
to trmug...@gmail.com, Raj Jain, vyoma_tempo...@googlegroups.com
*5.30 to 8