MGT603 Answer requested with ref other name of Bill of Materials

0 views
Skip to first unread message

Zubair Hussain

unread,
Jun 6, 2011, 1:28:53 AM6/6/11
to vuZs

Which of the following is the other name of Bill of Materials (BOM)?

 

       Product structure tree

       Time bucket schedule

       Inventory usage record

            Production parts plan 


In the pull mehtod of Just In Time production system what do we want to determine?


       Production features

       Customer’s orders

       Next stage of production

           Manufacturing schedule


Regards

Zubair Hussain
www.vuzs.net

Banjara

unread,
Jun 6, 2011, 3:18:10 AM6/6/11
to vu...@googlegroups.com
The possible other name of Bill of Materials can be Product Structure tree
 
 
 
the BOM is also known as the formula, recipe, or ingredients list. In electronics, the BOM represents the list of components used on the printed wiring board or printed circuit board. Once the design of the circuit is completed, the BOM list is passed on to the PCB layout engineer as well as component engineer who will procure the components required for the design.
 
 
 
 
 
 


--
--
Please visit www.vuzs.net For Current & Old Papers, Quizzes, Assignments and study material.
--
You received this message because you are subscribed to the Google
Groups "vuZs" group.
--
To post a new message on this group, send email to vu...@googlegroups.com
--
Message Posting Rules: http://groups.google.com/group/vuZs/web/vuzs-basic-rules-for-posting-messages
--
To unsubscribe from this group, send email to vuZs+uns...@googlegroups.com
--
To join this group Send blank email from your virtual university email address to
vuZs+su...@googlegroups.com
or visit
http://groups.google.com/group/vuZs/subscribe
---
For more information Contact vuZs Manager at in...@vuzs.net



--



Marina Khan

unread,
Jun 6, 2011, 5:27:46 AM6/6/11
to vu...@googlegroups.com

In the pull mehtod of Just In Time production system what do we want to determine?


       ► Production features

        
       ► Customer’s orders

       ► Next stage of production

        Manufacturing schedule


Just in Time utilizes a pull system, the customer orders a product, this is either manufactured by the final process or taken from a small buffer stock, this generates a signal (the Kanban) to previous steps in the process to produce replacement stock.


--


Marina Khan 

Marina Khan

unread,
Jun 6, 2011, 5:20:37 AM6/6/11
to vu...@googlegroups.com

It can be "option 1" 

Which of the following is the other name of Bill of Materials (BOM)?

 

       ► Product structure tree

       ► Time bucket schedule

       ► Inventory usage record

            Production parts plan 

The bill-of-materials is a file made up of bills-of-material (BOM). Each BOM is a hierarchical listing of the type and number of parts needed to produce one unit of finished goods. Other information, such as the routings (the route through the system that individual parts take on the way to becoming a finished good), alternate routings, or substitute materials may be also be contained with the BOM. 

A tool known as a product structure tree is used to clarify the relationship among the parts making up each unit of finished goods.






Marina Khan 

Reply all
Reply to author
Forward
0 new messages