Hi all,
I’ve been considering a way to optimize our VNA measuring workflow. To ensure accuracy, I currently wait a few minutes for the standards to thermally stabilize after connection, often working on other tasks in the meantime.
It would be very helpful to have a "settling time" function that allows us to set a 5-minute countdown before the measurement automatically begins. This would ensure we don't miss the start time while multitasking and would guarantee that the equipment is always properly stabilized before data collection.
Does this make sense to everyone? I’d be interested to hear if you think this would be a valuable addition.
Patric