Brakes India Private Limited Dream core placement registration 2021 Batch

463 views
Skip to first unread message

VIT Placement

unread,
Mar 12, 2021, 11:41:21 PM3/12/21
to vitian...@googlegroups.com, vitia...@googlegroups.com

 

Dream Core Placement - 2021 Batch

 

 

 

Name of the Company

 

Brakes India Private Limited 

 

 

Category

 

Dream core

 

 

Date of Visit:                    

 

Will be announced later

 

 

 

Eligible Branches          

 

 

 Ø  B. Tech (Electronics & Communication Engg)

Ø  B. Tech (ECE with Biomedical Engg)

Ø  B. Tech (Electronics and Communication Engineering with Spec in IoT and Sensor)

Ø  B. Tech (ECE with specialization in Embedded Systems)

Ø  B. Tech (ECE with specialization in VLSI)

Ø  B. Tech (Electrical & Electronics Engg)

Ø  B. Tech (Electronics & Instrumentation Engg)

Ø  B. Tech (Mechanical Engg)

Ø  B. Tech (Mechanical – with specialization in Energy Engineering)

Ø  B. Tech (Production & Industrial Engineering)

Ø  B. Tech (Mechanical with specialization in Automotive Engineering)

Ø  B. Tech (Electronics and Computer Engineering)

 

 

 

Eligibility Criteria          

 

% in X and XII – 85% or 8.5 CGPA

 

in Pursuing Degree – 80% or 8.0 CGPA 

 

No History of Arrears

 

 

CTC

 

·  First 6 months : 3.08 lakhs per annum 

·  Next 6 Months: 3.9 lakhs per annum 

·  After one year: 4.9 lakhs per annum

 

Stipend

 

Nil

 

 

Last date for Registration

 

13th March 2021 (4.00 pm)

 

 

 

Website

 

www.brakesindia.com

 

 

 

 

Note: Students with N or F Grades are not eligible.

 

Registration:

 

*All the interested and eligible students should register in given below link on or before 13th March 2021 (4.00 pm)

 

 https://docs.google.com/forms/d/e/1FAIpQLSeXxVbPbRew0pJO6EG4NLPcLMmkAvf7GiTuC3Xgz1NPqfRSxw/viewform

 

 

No Manual Registration & extension will be entertained.

 

 

 

 Note:- 

·  Selected GETs need to undergo one year manufacturing training at various location of Brakes India.   

·  Those who are really interested to go for higher studies, kindly advise them not to appear for this recruitment process.  

 Batch Preferred:- 

  • 2019-20 (2020 Batch Pass-out Candidates) 
  • 2020-21 (2021 Batch Pass-out Candidates)

Branch preferred:- 
  • Mechanical / Production / Automobile / Mechatronics Engineering. 
  • Electrical & Electronics Engineering / Electronics & Communication Engineering. 

Qualification Criteria:- 

  • SSLC & HSC:  Above 85% (or) Diploma: Above 85% (No History of Arrears) & BE / B.Tech - Above 80% (No History of Arrears) - Only English Medium. 

 Remuneration Packages:- (CTC) 

  • First 6 months : 3.08 lakhs per annum 
  • Next 6 Months: 3.9 lakhs per annum 
  • After one year: 4.9 lakhs per annum 

 

Mandatory Note:

 

1. Branches, eligibilities and date for the selection process are tentative and subject to change.

2. Please update your resume with all relevant details and projects done, in Campus interaction Portal as there would be shortlisting by the company for the selection process.

3.  Appear for the selection process in formal dress.

4.  Carry your updated Resumes, photos, College photo ID and all other relevant certificates.

     before the selection process.

5.  Late comers will not be allowed to attend the selection process. 

 

Dr.Samuel Rajkumar V

 

                       (Director of Placements)

 

--
Warm regards.
Dr. V. Samuel Rajkumar B.E.,MBA,MHRM, PhD
Director(Placement and Training)
VIT 
Vellore - 14, Tamil Nadu, India

VIT – Recognised as Institution of Eminence (IoE) by Government of India

* Ranked No.1 Private Engineering Institution by MHRD, Govt of India for 4 years in a row(NIRF-2016 2017,2018 and 2019 rankings)

* Ranked No.1 Private Institution for Innovation(ARIIA 2019 award) by Govt. of India

* In the Top 550 of the QS World University Ranking by Subject in 3 subjects: CS&IS, EEE and Chemistry

* The first University in India to get 4-STAR rating from  QS, the international ranking agency. 

* Recipient of Diamond Rating(Highest Rating) from QS-I Gauge in 2018

Reply all
Reply to author
Forward
0 new messages