1. VISTA 1&2 - RECEPTION LOBBY FALSE CEILING POP REPAIR WORK DONE BY THE IN-HOUSE PAINTER.
2. VISTA - B3 LEVEL PUMP ROOM RO'S 0.5HP PUMP REINSTALLED POST REPAIRS.
3. VISTA 1,2 & 3 - 7TH FLOOR TO LOWER FOOORS EXIT DOORS DUSTING, MOPPING AND CLEANING IS IN PROGRESS BY THE HK STAFF.
4. VISTA - S" LEVEL TILED FLOOR'S (R CITY & TRACK SIDE) SCRUBBING WITH T" BRUSH AND CLEANING DONE BY THE HK STAFF.
5. VISTA - HK CLEANING ACTIVITIES.