Dear Members,
 
Greetings of the day!

Kindly find the attached DMR dated  09th July'26.
1. VISTA 3 TERRACE AREA DOMESTIC FLOAT SENSOR INSTALLATION WORK IS DONE.
2. VISTA STILT LEVEL NEAR SWIMMING POOL SIDE NANI TRAP AND MULTI TRAP FIXING WORK DONE.
3. VISTA RAILWAY SIDE CHAMBER LID WELDING WORK DONE BY INHOUSE ELECTIRICAN.
4. VISTA 3 CHOCK UP REMOVING DONE BY RODDING MACHINE.
5. VISTA 2 REFUGE FLOOR DUSTING AND CLEANING WORK DONE.
6. VISTA P2 AND B1 LEVEL PARKING AREA WATER REMOVING WORK DONE. 
Thanks & Regards,

  

 
Dipesh Patel

Facility Manager-The Address-Vista 1,2 & 3