Fwd: VAUX - Additional Conduit To Connect Savier Electrical Room EV Panel to Junction Box - FOLLOW UP

2 views
Skip to first unread message

Joe Mack

unread,
Jul 29, 2026, 2:15:14 PM (8 days ago) Jul 29
to vauxof...@googlegroups.com, Cynthia Horvath, Jerry Jay

What work is Kevin trying to do?

i’m confused. Can any work be done before the York makes recommendations and the board approves?



---------- Forwarded message ---------
From: Kevin Shannon <kev...@ticeelectric.com>
Date: Wed, Jul 29, 2026 at 9:09 AM
Subject: RE: VAUX - Additional Conduit To Connect Savier Electrical Room EV Panel to Junction Box - FOLLOW UP
To: Cynthia Horvath <cjhor...@gmail.com>
CC: Joe Mack <jmmc...@gmail.com>, Hal Barwood <h...@finitearts.com>


I would like to do this work on this Friday the 31st.

Will this day work for you?

Be on site around 8 AM?

 

Thank you,

 

 

Kevin Shannon

Tice Electric Company

Estimator/Project Manager

Phone 503-872-8238 Cell 503-341-7317

kev...@ticeelectric.com    

Email Logo

 

 

 

From: Cynthia Horvath <cjhor...@gmail.com>
Sent: Thursday, July 16, 2026 5:05 PM
To: Kevin Shannon <kev...@ticeelectric.com>
Cc: Joe Mack <jmmc...@gmail.com>; Hal Barwood <h...@finitearts.com>
Subject: Re: VAUX - Additional Conduit To Connect Savier Electrical Room EV Panel to Junction Box - FOLLOW UP

 

Hi Kevin,

 

We are ready to move forward with this project.  There is some debate as to the appropriate placement of the junction box given all the conduits to work around in the Savier electrical room.  We stated the desire to place the junction box near the southwest corner which is pretty cluttered with other conduits as you can see in the picture below.  We can discuss when you arrive to clarify the best placement.

 

I will send Kin Living your proposal and they will be in touch with you to make sure they have everything they need.

 

Let me know when you would like to schedule this and the follow up for the permit requirement.

We look forward to working with you again.

Thank you.

 

Cindy

 



On Jul 6, 2026, at 2:41PM, Kevin Shannon <kev...@ticeelectric.com> wrote:

 

Cynthia,

We finally got the information we needed from PGE about your fault current for the new panel we installed.

I can have Levi come back and finish up and final the permit. (Will just be a couple hours)

 

If you think in the next couple weeks you will want the conduit, core drill, and box done, I will hold off.
Let me know if you have approval for the conduit and box or any other questions.

 

Thank you,

 

 

Kevin Shannon

Tice Electric Company

Estimator/Project Manager

Phone 503-872-8238 Cell 503-341-7317

kev...@ticeelectric.com    

 

 

 

From: Cynthia Horvath <cjhor...@gmail.com>
Sent: Tuesday, June 9, 2026 4:16 PM
To: Kevin Shannon <kev...@ticeelectric.com>
Cc: Joe Mack <jmmc...@gmail.com>; Hal Barwood <h...@finitearts.com>
Subject: VAUX - Additional Conduit(s) To Connect Savier Electrical Room EV Panel to Junction Box - FOLLOW UP

 

Hi Kevin,

 

Upon looking at the Savier electrical room, the EV panel is located on the East wall (above the desk) which was necessary given other equipment in there.  But it presents a dilemma of where to locate the junction box.  I’m attaching pictures that show many existing conduits that may present more challenges than were faced in the Raleigh electrical room.  I had suggested the SouthWest corner to best serve owners accessibility.

 

We would like you to stop by to look and determine best location of junction box considering accessibility and cost.

Let me know a convenient time you can stop by to take a look.

 

Thanks.

 

Cindy

 

 

image003.jpgimage001.jpgimage004.jpg