You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to Utah Randonneuring
Due to road construction, the Willard Bay routes have changed substantially from previous years, but I now have the GPS files posted to rwgps. I am updating the cue sheets and will post those in another day or two.
These files are finalized and ready to be loaded on to your GPS units:
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to utah-...@googlegroups.com
Ken,
Thanks for this. Could you tell me anything about where the construction is? The following week, BCC has its very similar Metric and Super Series rides, and we should be looking at our routes, too.
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to Utah Randonneuring
Really, there's heavy construction along the whole southern half of the route, as well as brand new roads and roads that have disappeared. I've shared my notes with BCC (Jason Koon) so hopefully they'll be ok. (I'll probably ride the BCC ride the following week too, I love riding this area).