Hi Belen,
Can you show us how the last step in configuring a PSE looks on your side (similar with my screenshot)?
Please notice the temporary display in the top-right corner of a message with the number of operations about to be launched by the current configuration.
Have you waited until the PSE steps are all done ?
You can see if operations are still running by going to the Project -> Operations page and looking to see if rows still have color blue or yellow (running / scheduled for execution).
Only when the PSE row becomes green (executed successfully) the PSE visualizers will show you the results.
You should not stop TVB while the PSE is still running (blue).
If you do not want to wait too long, try with a smaller range (e.g. 5 x 5) first.
Best,