1. Network
1.1 Current #--Simulation of current situation
1.1.1 NUS_BUS_1 - High Deman-All Frequency #--Current situation with HIGH demand, bus frequency low and high
1.1.2 NUS_BUS_1 - Low Demand-All Frequency #--current situation with LOW demand, bus frequency low and high
1.2 Proposal
1.2.1 NUS_BUS_1 - A2-B-C Re Route #--Proposed scenario,Re-route service A2/B/C
1.2.2 NUS_BUS_1 - U Town-MRT #--Proposed scenario for future, include U Town and increased demand at NUH
2. PGA File
2.1 NUS_BUS_1 - A2-B-C Re Route.pga #--Archived .pga file (single file)
2.2 NUS_BUS_1 - High Deman-All Frequency.pga #--Archived .pga file (single file)
2.3 NUS_BUS_1 - Low Demand-All Frequency.pga #--Archived .pga file (single file)
2.4 NUS_BUS_1 - U Town-MRT.pga #--Archived .pga file (single file)
3. PMX Model
3.1 NUS Bus #--We make a NUS 3D bus model, which can be added in the network
4. Report
4.1 Current
4.1.1 High Demand_All Frequency_30 Runs #--Report for network 1.1.1 (30 runs)
4.1.2 Low Demand All Frequency 30 Runs #--Report for network 1.1.2 (30 runs)
4.2 Proposal
4.2.1 A2-B-C Reroute_10 runs #--Report for network 1.2.2 (10 runs)
4.2.2 U Town MRT_10 runs #--Report for network 1.2.3 (10 runs)