Project All in one 意见

4 views
Skip to first unread message

elimoqi

unread,
Nov 15, 2010, 8:04:20 AM11/15/10
to tp502...@googlegroups.com
To 徐严
刚刚看了一下你上传在Group里面的附件“TP5025-Group 4-All in one.pdf”,有几个问题

1. Simulation 第9页没有页眉
2. Simulation 第10页之后的页眉都是错误的
3. Simulation 第26页,两个表格中的负号含义是相反的……你在底注里面说这两个是一样的
4. Simulation表格感觉总体上没有第一部分的表格看着顺眼,格式感觉不是很统一,有些表格显得很大,最好能改一下
5. 最后封面的第一页: 不应该是“Research Project”, 应该是“Literature review”

我这边就这几个问题

XUYAN

unread,
Nov 15, 2010, 8:07:03 AM11/15/10
to tp502...@googlegroups.com
呵呵,收到, 好仔细啊!
:)

2010/11/15 elimoqi <eli...@gmail.com>



--
XU YAN
School of Computing, NUS, Singapore
Pasir Panjang Road, BLK 334, 03#15
PostCode: 118659
HP: (+65) 83985113
Email: xuyan888...@gmail.com

XUYAN

unread,
Nov 15, 2010, 8:53:36 AM11/15/10
to tp502...@googlegroups.com
已修改上传!!

2010/11/15 XUYAN <xuyan888...@gmail.com>

elimoqi

unread,
Nov 15, 2010, 9:06:05 AM11/15/10
to tp502...@googlegroups.com
我刚刚把Simulation分成了3个部分也都上传了,因为group不能上传10M以上的
包括了以下的内容
1. Network
    1.1 Current #--Simulation of current situation
        1.1.1 NUS_BUS_1 - High Deman-All Frequency #--Current situation with HIGH demand, bus frequency low and high
        1.1.2 NUS_BUS_1 - Low Demand-All Frequency #--current situation with LOW demand, bus frequency low and high
    1.2 Proposal
        1.2.1 NUS_BUS_1 - A2-B-C Re Route #--Proposed scenario,Re-route service A2/B/C
        1.2.2 NUS_BUS_1 - U Town-MRT #--Proposed scenario for future, include U Town and increased demand at NUH 

2. PGA File
    2.1 NUS_BUS_1 - A2-B-C Re Route.pga #--Archived .pga file (single file)
    2.2 NUS_BUS_1 - High Deman-All Frequency.pga #--Archived .pga file (single file)
    2.3 NUS_BUS_1 - Low Demand-All Frequency.pga #--Archived .pga file (single file)
    2.4 NUS_BUS_1 - U Town-MRT.pga #--Archived .pga file (single file)

3. PMX Model
    3.1 NUS Bus #--We make a NUS 3D bus model, which can be added in the network

4. Report
    4.1 Current
        4.1.1 High Demand_All Frequency_30 Runs #--Report for network 1.1.1 (30 runs)
        4.1.2 Low Demand All Frequency 30 Runs #--Report for network 1.1.2 (30 runs)
    4.2 Proposal
        4.2.1 A2-B-C Reroute_10 runs #--Report for network 1.2.2 (10 runs)
        4.2.2 U Town MRT_10 runs #--Report for network 1.2.3 (10 runs)


2010/11/15 XUYAN <xuyan888...@gmail.com>

XUYAN

unread,
Nov 15, 2010, 9:07:09 AM11/15/10
to tp502...@googlegroups.com
复习traffic plan的时候有习题做吗?

2010/11/15 elimoqi <eli...@gmail.com>

elimoqi

unread,
Nov 15, 2010, 9:14:49 AM11/15/10
to tp502...@googlegroups.com
他不出计算题……而且变成了开卷考试了

2010/11/15 XUYAN <xuyan888...@gmail.com>

elimoqi

unread,
Nov 15, 2010, 9:37:46 AM11/15/10
to tp502...@googlegroups.com
report和paramics文件都发送成功了,但是presentation的文件夹关闭了,我刚给他写了封邮件,问他打开权限吧!

2010/11/15 elimoqi <eli...@gmail.com>
Reply all
Reply to author
Forward
0 new messages