Im start using Visual Studio 2015 Enterprise and when I want to manage connections or anything else with Team Foundation Server give this error: Team Foundation Error, Page '3185ed96-1cbd-4381-a439-636973542e50' not found.What should I do?!
If this does not correct the issue, the next step is to try manually deleting the MEF cache dir. Please delete "%LocalAppData%\Microsoft\VisualStudio\15.0_\ComponentModelCache". The cache should be rebuilt on the next VS startup.
Table of Contents Title 2.2. Administration of Government Subtitle II. Administration of State Government Part B. Transaction of Public Business Chapter 43.1. Construction Management and Design-Build Contracting Article 3. Procedures for Covered Institutions 2.2-4381. Construction management or design-build contracts for covered institutions authorized
A. Any covered institution may enter into a contract for construction on a fixed price or not-to-exceed price construction management or design-build basis, provided that (i) the Department approves the use of construction management or design-build or, in the case of a denial by the Department, such institution receives approval as set forth in subsection F and (ii) such institution complies with the requirements of this article and with the procedures adopted by the Secretary of Administration for using construction management or design-build contracts.
3. Post all documents open to public inspection pursuant to 2.2-4342 that are exchanged between the covered institution and the Department on the Department's central electronic procurement website, known as eVA, prior to the date of submission of proposals; and
1. A written determination is made in advance by the covered institution that the design-bid-build project delivery method is not practicable or fiscally advantageous, and such writing shall document the basis for the determination to use construction management or design-build. The determination shall be included in the Request for Qualifications and maintained in the procurement file;
2. Prior to making a determination as to the use of construction management or design-build for a specific construction project, a covered institution shall have in its employ or under contract a licensed architect or engineer with professional competence appropriate to the project who shall (i) advise the covered institution regarding the use of construction management or design-build for that project and (ii) assist the covered institution with the preparation of the Request for Proposal and the evaluation of such proposals;
3. Public notice of the Request for Qualifications is posted on the Department's central electronic procurement website, known as eVA, at least 30 days prior to the date set for receipt of qualification proposals;
5. Prior construction management or design-build experience or previous experience with the Division shall not be considered as a prerequisite or factor considered for prequalification or award of a contract. However, in the selection of a contractor, a covered institution may consider the experience of each contractor on comparable projects of similar complexity and size;
6. Construction management contracts shall require that (i) no more than 10 percent of the construction work, as measured by the cost of the work, be performed by the construction manager with its own forces and (ii) the remaining 90 percent of the construction work, as measured by the cost of the work, be performed by subcontractors of the construction manager, which the construction manager shall procure by publicly advertised, competitive sealed bidding to the maximum extent practicable;
8. The procedures allow the covered institution to post on the Department's central electronic procurement website known as eVA when and where the general contractor plans to advertise bid packages for subcontracting opportunities when appropriate; and
D. The Department shall evaluate the proposed procurement method selected by a covered institution and offer its approval or denial as to whether the use of the construction management or design-build procurement method is appropriate for the specific project. In its review, the Department shall also consider:
E. The Department shall conduct its review within five working days after receipt of the written determination and render its written approval or denial within such five-working-day period. The written approval or denial of the Department shall be maintained in the procurement file.
F. If a covered institution elects to proceed with the project using a construction management or design-build procurement method despite the decision of the Department to the contrary, the Department shall present the written denial issued pursuant to subsection E to the board of visitors or governing board of such covered institution and the covered institution shall obtain approval by a majority vote of such board for (i) projects funded by funds other than those provided to such covered institution from the state general fund or (ii) projects of $65 million or more funded in whole or in part from state general funds. If the project is funded in whole or in part from state general funds, a representative from the Department, to the extent the Department deems practicable, shall be included in the process for the selection of a contractor following such approval by the board of visitors or governing board. For projects under $65 million funded in whole or in part from state general funds, the covered institution shall obtain approval from the Chairmen of the House Committee on Appropriations and the Senate Committee on Finance and Appropriations, or their designees, and a representative of the Department.
A written statement of a covered institution's decision to not follow the decision of the Department, its reasons therefor, and the vote of the board of visitors or governing board shall be maintained in the procurement file.
MECH 4381 Senior Design Project I (3 semester credit hours) Project-based capstone course. Student groups design, build, and test a device that solves an open-ended mechanical engineering design problem. MECH 4381 focuses on background research, design, and engineering analysis, MECH 4382 on prototype construction and testing. As designated MECH Writing-Intensive Courses, MECH 4381 and MECH 4382 also focus on the refinement of students' engineering communications skills and their use of writing as a critical-thinking and learning tool. Prerequisites: MECH 3305 and MECH 3320 and MECH 3351 and MECH 3340 and ECS 3390. (3-0) Y
CS 4381 - Digital Computer DesignCredits: 3
Machine organization, instruction set architecture design, memory design, control design: hardwired control and microprogrammed control, algorithms for computer arithmetic, microprocessors, and pipelining. Prerequisites: C- or better in CS 2240 and CS 3381 .
The DU4381Z-ST are compact and powerful short-throw laser projectors that deliver high brightness, a large projection size with vibrant colors, and diverse range of connectivity options. With up to 6,100 lumens of high brightness, a 3,000,000:1 contrast ratio, and up to 30,000 hours of laser light source life, this series is perfect for conference rooms, education, museums, and commercial applications.
The DU4381Z-ST complies with high standards for anti-dust protection, which ensures consistent brightness over time. (IP6X sealed optical engine design and IP5X for dust protection during projector operation)
The DU4381Z-ST has built-in HDBaseT interface support for the transmission of high-quality audiovisual content over standard CAT5e/6 LAN cabling. This allows the projector to be placed up to 100 m from the source with low-cost cabling.
The Model 4381 is a stainless steel pressure reducing regulator designed to handle small to mid-capacity flow rates in general, chemical, or cryogenic services. This unit is capable of controlling outlet pressure to a level between 2 and 500 Psig (.14 and 34.5 Barg). Model 4381 is designed to control a wide range of fluids including industrial gases, air, oil, steam, water, and many chemicals.
The SYN4381 "Triple Combo" integrates Wi-Fi 6/6E, Bluetooth 5.3, and IEEE 802.15.4 radios on a single state-of-the-art system-on-chip (SoC) to reduce the space, cost, power, complexity, and time to market of wirelessly enabled IoT devices. With applications ranging from multimedia streaming for the smart home to automotive entertainment, security, and the smart factory, the SYN4381 is Matter compliant for secure, seamless interoperability in a heterogeneous, multi-platform wireless environment.
The purpose of this guide is to support the research needs of students in ARTH4381 and contains recommendations for the major databases and resources used for finding information related to art history of this period, including background information, timelines, terminology, information on artists and their work. It includes information on locating secondary literature, images, etc.
H.R. 4381 would require the Secretary of the Interior to develop an onshore energy production strategy every four years. The bill also would require the Secretary to develop a national programmatic environmental impact statement (PEIS) for all onshore minerals. Based on information provided by the Bureau of Land Management (BLM), CBO estimates that implementing the legislation would cost $15 million over the 2013-2017 period, assuming appropriation of the necessary amounts. Enacting the bill would not affect direct spending or revenues; therefore, pay-as-you-go procedures do not apply.
The bill would require the Secretary to develop and publish every four years a strategy for the development of onshore federal energy and mineral resources. The bill would direct the Secretary to establish production objectives for oil, natural gas, coal, oil shale, and certain other minerals, as well as energy from wind, solar, biomass, hydropower, and geothermal resources. Based on information provided by the Department of the Interior about the cost of similar reports, CBO estimates that developing the four-year strategy would cost $7 million over the 2014-2015 period, assuming appropriation of the necessary amounts.
3a8082e126