Dear Tevis Colleagues:
Here is a copy of our comprehensive report (five pages long, with many photos) of the trail maintenance work performed by the Tevis Trail Crew on Friday, May 17, 2013. This was some of the most difficult work that we had ever performed (steep topography and hard rocks). As a point of history, it was the first time in 56 years that the Tevis Trail Crew used a boulder-carry sling constructed of nylon webbing in a double-parabola shape.
Respectfully submitted, Bob Sydnor
attachment
Robert H. Sydnor
Tevis Trail Crew (under Greg Kimler)
Tevis Ride Committee (under Chuck Stalley, Ride Director)
AERC Trail Master
California Certified Engineering Geologist #968