TEC Floorplan Backup_1st_Revised

0 views
Skip to first unread message

Amirrul Zamani

unread,
Mar 15, 2011, 7:35:36 PM3/15/11
to tec2011...@googlegroups.com
Dear All,

This is the 1st backup layout for six 6M X 6M booth. 2nd backup is on process of technical drawing.

Hope you guys can patiently wait for it.

Thanks.

Warmest regards,
--
Amirrul Zamani Suhaimi,
Chemical Engineering,
Universiti Teknologi PETRONAS.
Mobile: (+6) 013 5320401
E-mail: real.ani...@gmail.com

" the bended knee is not a tradition of our Corps "
Backup_of_tec2011rev1.JPG

maha arsenal

unread,
Mar 16, 2011, 12:45:43 AM3/16/11
to tec2011...@googlegroups.com
mirul...since u r preparing the 2nd draft...try 2 talk 2 daus....v discussed bout it y'day...n came up wit a new plan dat can accommodate 7 6x6...c whthr can muat anot...thnx bro...
--
"Be the change you want to see in the world"

M.Maha
013-3972611
Chemical Engineering
UTP

Amirrul Zamani

unread,
Mar 16, 2011, 8:31:45 AM3/16/11
to tec2011...@googlegroups.com
dah discuss this afternoon.
try la to accomodate u guys

On 3/16/11, maha arsenal <maha.a...@gmail.com> wrote:
> mirul...since u r preparing the 2nd draft...try 2 talk 2 daus....v discussed
> bout it y'day...n came up wit a new plan dat can accommodate 7 6x6...c whthr
> can muat anot...thnx bro...
>
> On 16 March 2011 07:35, Amirrul Zamani <real.ani...@gmail.com> wrote:
>
>> Dear All,
>>
>> This is the 1st backup layout for six 6M X 6M booth. 2nd backup is on
>> process of technical drawing.
>>
>> Hope you guys can patiently wait for it.
>>
>> Thanks.
>>
>> Warmest regards,
>> --
>> Amirrul Zamani Suhaimi,
>> Chemical Engineering,
>> Universiti Teknologi PETRONAS.
>> Mobile: (+6) 013 5320401
>> E-mail: real.ani...@gmail.com
>>
>> " the bended knee is not a tradition of our Corps "
>>
>
>
>
> --

> *"Be the change you want to see in the world"*


>
> M.Maha
> 013-3972611
> Chemical Engineering
> UTP
>

firdaus 19 daud

unread,
Mar 16, 2011, 8:46:11 AM3/16/11
to tec2011...@googlegroups.com, Amirrul Zamani
td abe ad tgok layout, then die pon ad kasi pendapat..
--
Regards;



Muhamad Firdaus bin Che Rahim
B.Eng (hons) Chemical Engineering
Universiti Teknologi PETRONAS
(013) 796 7038
http://www.utptec.com/

"Great minds don't think alike"


Amirrul Zamani

unread,
Mar 16, 2011, 9:25:52 AM3/16/11
to firdaus 19 daud, tec2011...@googlegroups.com
Plis list down the remarks dr die. Send mlm ni la, as ak tgh lukis2 layout nih

firdaus 19 daud

unread,
Mar 16, 2011, 9:36:38 AM3/16/11
to Amirrul Zamani, tec2011...@googlegroups.com
cmni

td die compare 3 layouts

1) yg awal2 dipropose
2) yg sne suggest
3) yg latest, proposed from log


so, abe ckp, die xkisah mcm mane, tp yg pasti, kene accomodate sume booths no matter how. even kalo terpksa reduce number of sport cars, xpe.

so td, abe cm lg suke ngan ap yg sne proposed, sbb;
1) booths sume cukup
2) sport car bley masuk
3) ad space utk exhbtn, abe nk letakkan interactive exhibition kat tmpt yg dkt2 ngan entrance

ak da ckp, kalo cmtu, mgkin angin kuat,hujan akan smpai ke part security (cm mirul bgtahu ak), then abe ckp, "xde la, xde smpai cmtu hujan nye"

n ak ckp kalo cmtu, takut t kereta2 calar sbb mgkin things akan terbang dibawa angin n hit the car, abe ckp" as long kite xbt mende tu dlm enclosed space, xpe,kite bt open je"

n abe ckp, abe nk sgt sne usahakan utk bwk planetarium dtg, their hemisphere stimulator tu sgt interactive

itu sajoh

Amirrul Zamani

unread,
Mar 16, 2011, 8:55:23 PM3/16/11
to firdaus 19 daud, tec2011...@googlegroups.com
noted. working on progress. pass kt ak yg sne nyer proposed. and i'll do the rest

firdaus 19 daud

unread,
Mar 16, 2011, 10:26:37 PM3/16/11
to Amirrul Zamani, tec2011...@googlegroups.com
t ak pass yg maha lukis tgn tuh..

maha arsenal

unread,
Mar 16, 2011, 10:29:02 PM3/16/11
to tec2011...@googlegroups.com, firdaus 19 daud, Amirrul Zamani
nvmind....im goin 2 amirul's rum nw 2 do it...
--
"Be the change you want to see in the world"

firdaus 19 daud

unread,
Mar 16, 2011, 10:34:33 PM3/16/11
to maha arsenal, tec2011...@googlegroups.com, Amirrul Zamani
ok2, properly discuss, n try to come out with backup as much as possible..if possible, next monday, we already distribute the layout to companies
Reply all
Reply to author
Forward
0 new messages