Ref,
202605014 | Yatadolawatta_Army_EBTS_KL9007-New Site Installation PWR | Power_2026_1200 | Manjula | Southern |



Activity Scope Details :
Proceed under AP WO: INH_Southern_KL9007_Yatadolawatta_Army_EBTS_AP Upgrades_New Site Installation_AP_2026_2539-Customer Complaint
Pls proceed with an AC/DC convertor sup
Note:
Possible to tap power from the building power MCB
Site proposed under ACDC power converters.
Approximately 10m of 2-core 6sqmm required from the building MCB to the power sharing point
Approximately 10m of 2-core armored UG required to the FP.
A kWh meter, Class-1 SPD, and a power-sharing MCB are proposed to be installed on the wall.
The power-sharing capacity is required to be verified against the AP team’s load requirements and the SO’s available power capacity.
Air terminal proposed to the FP as it’s located in highest location in the premises.

Thanks & Regards,
Eranga Perera
Project Manager
Oxcenture Eng. PVT LTD
Mobile : 0707334473
From: not...@dialog.workhub24.com <not...@dialog.workhub24.com>
Sent: Tuesday, May 26, 2026 11:39 AM
To: oxcentur...@gmail.com; oxcenture....@gmail.com
Subject: INH_KL9007_Yatadolawatta_Army_EBTS_Power_New_Rectifier_Power_2026_1200_PM - Task Acceptance
|
| Yatadolawatta_Army_EBTS_KL9007-New Site Installation PWR-Contract | Power_2026_1200 | 202605014 |
| Yatadolawatta_Army_EBTS_KL9007-New Site Installation PWR-Non Contract | Power_2026_1200 | 202605014-1 |