FW: INH_Central_TM0099_Peradeniya_EFac_Temp_AP Upgrades_New Site Installation_AP_2025_2067_Event - New Site - Task Acceptance

0 views
Skip to first unread message

oxcenture.eranga@gmail.com

<oxcenture.eranga@gmail.com>
unread,
Sep 25, 2025, 12:56:26 AM9/25/25
to teamoxcenture@googlegroups.com, Accenture Engineering

Ref,

 

202509004

Peradeniya_EFac_Temp_TM0099-Event Upgrade

AP_2025_2067

Manjula

Central

202509004-1

Peradeniya_EFac_Temp_TM0099-Event Degrade

AP_2025_2067

Manjula

Central

202509004-2

Peradeniya_EFac_Temp_TM0099-Event Upgrade-Material Supply

AP_2025_2067

Manjula

Central

 

 

 

 

Commissioning Data Details :

 

Temporary Site.

Can operate from Integration License

 

 

Detailed Project Scope(AP Upgrades) :

 

Scope

New Temporary site with 5G for Peradeniya Eng Faculty exhibition

Target On Air Date = 22nd September

Backhaul and Power

Power and OFN connectivity needs to be extended from existing Lamp pole [Lamp pole will be shutdown during temp site operation]

path distance from Lamp to new Cabinet Aprox 40m

Both cables should be laid underground [trench] as per University administration

After event power and fiber needs to be reverted back to Lamp Pole

Tree Site TE installation

Place a new Outdoor cabinet near Mobitel Tree and install 2 Nos of BB cards and other equipment [1 BB for DCS/4G and other for 5G NR]

Install 5 Nos of antennas for each of 3 sectors as per below provided Table

2 Nos of 5G antennas and 5G RRUs to be taken from Kotugodella_St [Removed items during perahera already available in site cabin]

Connect RRUs to relevent antennas and configure RET connections

L26 RRU8863 needs to be shared between Sec2 and sec3

Connect 2 Nos of 5G RRUs to one BB card

Connect all other 8 Nos of RRUs to be connected to other BB card

Install a GPS and share clock between BB cards

Commission the site

 

Antenna Details

 

 

 

Required Materials (AP Upgrades) :

 

Required

18 Port Antennas - 2 Nos

Dual Array Antenna - 1 Nos

2Split 4T4R Antennas - 2 nos

BB6630 Units - 1 Nos

RRUS12B3 (For DCS) - 2 Nos

RRU4499 or RRU4443 - 5 Nos

RRU8863 - 1 Nos

RRU8863n78 [For 5G NR] - 2 Nos (To be taken from Kotugodella_St Cabin)

Ericsson SFP Normal - 16 Nos

Ericsson high speed SFP (for 5G) - 4 Nos

Ericsson RRU CPRI fiber cables 70m - 10 Nos

Ericsson RRU DC power cables - 350m

Ericsson RRU Power connectors - 10 Nos

RRU8863 to 18 Port Jumpers 5m - 8 Nos

RRU4499 or RRU4443 to Dual Array ant jumpers 1m - 4 Nos

RRU4499 or RRU4443 to 2Split ant jumpers 1m - 16 Nos

RRUS12B2 to 18 Port Jumpers - 4 Nos

RRU8863n78 to 18 Port Ant Cluster cables 1m - 2 Nos

Ericsson GPS Kit - 1 Nos

 

 

 

 

 

 

 

Thanks & Regards,

Eranga Perera

Project Manager
Oxcenture Eng. PVT LTD

 

 

From: not...@dialog.workhub24.com <not...@dialog.workhub24.com>
Sent: Tuesday, September 23, 2025 7:05 AM
To: oxcentur...@gmail.com; oxcenture....@gmail.com
Subject: INH_Central_TM0099_Peradeniya_EFac_Temp_AP Upgrades_New Site Installation_AP_2025_2067_Event - New Site - Task Acceptance

 

Input Task waiting for you

 

 

INH_Central_TM0099_Peradeniya_EFac_Temp_AP Upgrades_New Site Installation_AP_2025_2067_Event - New Site

 

Deadline:

 

 

 

If you’re having trouble clicking the link, copy and paste the URL below into your web browser.

 

 

Thanks,
The WorkHub24 Team

 

 

image001.png
image010.png
image011.gif
image012.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
image009.png
INH_Central_TM0099_Peradeniya_EFac_Temp_AP Upgrades_New Site Installation_AP_2025_2067_Event - New Site.eml
image.png
image.png

Accenture Engineering

<accenture.engineering@gmail.com>
unread,
Jun 13, 2026, 7:07:25 AM (21 hours ago) Jun 13
to oxcenture.eranga@gmail.com, teamoxcenture@googlegroups.com
Re updated,

Peradeniya_EFac_Temp_TM0099-Event Upgrade-Contract AP_2025_2067 202509004
Peradeniya_EFac_Temp_TM0099-Event Degrade-Contract AP_2025_2067 202509004-1
Peradeniya_EFac_Temp_TM0099-Event Upgrade-Non Contract AP_2025_2067 202509004-2
Reply all
Reply to author
Forward
0 new messages