FW: INH_Western_CM0185_Bloomfield_AP Upgrades_Sector Upgrade_AP_2025_1988_Event - Upgrade - Task Acceptance

0 views
Skip to first unread message

oxcenture.eranga@gmail.com

<oxcenture.eranga@gmail.com>
unread,
Sep 25, 2025, 2:37:31 AM9/25/25
to teamoxcenture@googlegroups.com, Accenture Engineering

Ref,

 

202509008

Bloomfield_CM0185-Event Upgrade

AP_2025_1988

Manjula

Western

202509008-1

Bloomfield_CM0185-Event Degrade

AP_2025_1988

Manjula

Western

202509008-2

Bloomfield_CM0185-Event Upgrade-Material Supply

AP_2025_1988

Manjula

Western

 

 

 

 

Detailed Project Scope(AP Upgrades) :

 

Common Scope

Need to add new sector as sec 02

Sector 01

Need to replace existing antenna by APE antenna

Need to add New RRU5828 RRU for Sec 01

Need to connect 4 Port to APE antenna & Config L2600 As 4T4R

Sector 02

•                     Install the Penta beam antenna in 6m pole in given height and azimuth.

•                     Add 3Nos. of RRU5502 for Penta beam antenna (can place on top of the power cabinet)

•                     Lay the fiber as per the given diagram.

•                     need to add new 2Nos of UBBPe6 Card for BBU

•                     Need to add 2600 for Sec 02 & use existing antenna for upgrade . 4port of Sec 01 L2600 RRU

•                     Need to connect 4 Port to APE antenna & Config L2600 As 4T4R

•                     Required to config new sector as Sec 02 & keep existing sec 02 cell in locked status

Sector 03

•                     Need to replace existing RRU5501 by RRU5513

Configuration Scope

Existing

FDD - 1+1+[1+1]+1

L2100 – 1/1+0+[1+1]+1/1

DCS - 2+2+2+4

Proposed

FDD - 1+[1+1+1+1+1]+[1+1]+1 - new cells are 2T2R and BW 20M

L2100 – 1/1+ [1/1+1/1+1/1+1/1+1/1]+[1/1+1/1]+1/1 - new cells are 2T2R and BW 15M/10M

DCS - 2+[2+2+2+2+2]+2+4 (15W per TRX)

L2600 – 1/1/1/+0+1/1/1+0

 

Required Materials (AP Upgrades) :

 

Materials required

1Nos of 5NPX1006F_5B antenna

3Nos of RRU5502

1Nos of RRU5513

1Nos of RRU5258

1Nos of APE antenna

1nos of UBBPe6

1Nos of 50m fiber cable

1nos of 50m Power cable

3Nos of 40m fiber cables

3Nos of 40m power cables

10 Nos of 5m Jumper cables. (Penta beam antenna)

9 Nos of 3m jumper cable ( RRU5258 to AMB/APE antenna)

8Nos of 10G SFP

 

 

 

 

Thanks & Regards,

Eranga Perera

Project Manager
Oxcenture Eng. PVT LTD

 

 

From: not...@dialog.workhub24.com <not...@dialog.workhub24.com>
Sent: Wednesday, September 24, 2025 6:20 AM
To: oxcentur...@gmail.com; oxcenture....@gmail.com
Subject: INH_Western_CM0185_Bloomfield_AP Upgrades_Sector Upgrade_AP_2025_1988_Event - Upgrade - Task Acceptance

 

Input Task waiting for you

 

 

INH_Western_CM0185_Bloomfield_AP Upgrades_Sector Upgrade_AP_2025_1988_Event - Upgrade

 

Deadline:

 

 

 

If you’re having trouble clicking the link, copy and paste the URL below into your web browser.

 

 

Thanks,
The WorkHub24 Team

 

 

image001.gif
image002.png
image003.png
image004.png
image005.png
image006.png
Re: Event Triggering - CM - Bradby Shield Encounter 2025.eml
Bloomfield-CM0185-BH__SectorAddition_BTSInfoWO.xlsx
TX Requirement.csv
INH_Western_CM0185_Bloomfield_AP Upgrades_Sector Upgrade_AP_2025_1988_Event - Upgrade.eml
Bloomfield-CM0185-BH__SectorAddition_BTSInfoWO.xlsx

Accenture Engineering

<accenture.engineering@gmail.com>
unread,
Jun 13, 2026, 6:28:02 AM (22 hours ago) Jun 13
to teamoxcenture
@ Muditha UAT,
Re: Event Triggering - CM - Bradby Shield Encounter 2025.eml
Bloomfield-CM0185-BH__SectorAddition_BTSInfoWO.xlsx
TX Requirement.csv
INH_Western_CM0185_Bloomfield_AP Upgrades_Sector Upgrade_AP_2025_1988_Event - Upgrade.eml
Bloomfield-CM0185-BH__SectorAddition_BTSInfoWO.xlsx

oxcenture.muditha@gmail.com

<oxcenture.muditha@gmail.com>
unread,
Jun 13, 2026, 6:43:42 AM (22 hours ago) Jun 13
to teamoxcenture@googlegroups.com, Accenture Engineering

FYI

@ Muditha UAT,

Image removed by sender.

--
You received this message because you are subscribed to the Google Groups "Team Oxcenture" group.
To unsubscribe from this group and stop receiving emails from it, send an email to teamoxcentur...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/teamoxcenture/CAEko1FH-hs8Jt3im1VWS1y9TZHS0p_JnHEzsoXngE3KYwAZZsA%40mail.gmail.com.

~WRD2075.jpg
image001.png
image002.png
image003.png
image004.png
image005.gif
image006.png
CM0185-Bloomfield_Event Upgrade-AP_2025_1988_Verified UAT Document.xlsx

Accenture Engineering

<accenture.engineering@gmail.com>
unread,
Jun 13, 2026, 6:54:52 AM (22 hours ago) Jun 13
to oxcenture.eranga@gmail.com, teamoxcenture@googlegroups.com
Ref updated

202509008-2-Ref Cancelled


Bloomfield_CM0185-Event Upgrade AP_2025_1988 202509008
Bloomfield_CM0185-Event Degrade AP_2025_1988 202509008-1
Bloomfield_CM0185-Event Upgrade-Material Supply AP_2025_1988 202509008-2
Reply all
Reply to author
Forward
0 new messages