FW: INH_Southern_GA0375_Galle_Rd_Hikkaduwa_AP Upgrades_New Site Installation_AP_2026_2437_Other - Task Acceptance

0 views
Skip to first unread message

Eranga Perera

<oxcenture.eranga@gmail.com>
unread,
Mar 5, 2026, 5:44:49 AMMar 5
to teamoxcenture@googlegroups.com, Accenture Engineering

Ref,

 

202603006

Galle_Rd_Hikkaduwa_GA0375-New Site Installation

AP_2026_2437

Manjula

Southern

 

Note : BBU pooling site GA5001

 

 

 

Detailed Project Scope(AP Upgrades) :

 

Project scope

Please proceed with the New sector Installation WO

remote RRU solution as a sector addition from  GA5001 .  The remote RRU location is Galle_Rd_Hikkaduwa-GA0375

install 2 antennas and RRUs at GA0375 in given azimuth. cascade RRUS11B1 and Radio2219B1 together and configure as 2 sectors. only 2 fiber core connected to Hikkaduwa_Tourism_Lamp_2-GA5001 BB and configure 2 sectors by cascading RRUs at top of tower. finally need to configure L21 1st  both sectors.

Requried Meterials

RRUS11B1 =1nos

Radio2219B1 =1nos

RRUS12B1  power cable = 10m

Radio2116B1 power cable = 10m

Radio2116B1 fiber cable = 1nos of 10m

RRUS11B1 power connectors = 2nos

Radio2219B1 power connectors = 2nos

RRUS11B1 SFP 47/2 (1G)= 2nos

Radio2219B1 SFP 65/3 (10G-10Km)=2nos

RRUS11B1 to HWX6516 Jumper cable = 3m Jumper cable=2nos (DIN to DIN)

Radio2219B1B1 to  HWX6516 Jumper cable = 3m Jumper cable=2nos (4.3 to DIN)

LC to LC cascase cable=10m

HWX6516 antenna =2nos

AC/DC convertors =2nos

 

 

 

 

 

 

 

Thanks & Regards,

Eranga Perera

Project Manager

Oxcenture Eng. PVT LTD

Mobile : 0707334473

 

From: not...@dialog.workhub24.com <not...@dialog.workhub24.com>
Sent: Tuesday, March 3, 2026 9:41 AM
To: oxcentur...@gmail.com; oxcenture....@gmail.com
Subject: INH_Southern_GA0375_Galle_Rd_Hikkaduwa_AP Upgrades_New Site Installation_AP_2026_2437_Other - Task Acceptance

 

Input Task waiting for you

 

 

INH_Southern_GA0375_Galle_Rd_Hikkaduwa_AP Upgrades_New Site Installation_AP_2026_2437_Other

 

Deadline:

 

 

 

If you’re having trouble clicking the link, copy and paste the URL below into your web browser.

 

 

Thanks,
The WorkHub24 Team

 

 

image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
New Inhouse WO Galle_Rd_Hikkaduwa-GA0375.xlsx
Reservation Number - Advantis.csv
Required Materials Table - AP.csv
TX Requirement.csv
Material reservation Table - Initiation(ADV).csv
Material reservation Table - Initiation(ACE).csv
Material Reservation Request.csv
Material Reservation Request (ACE).csv
Reservation Number - Advantis.csv
Reservation Number - ACE.csv

oxcenture indika

<oxcenture.indika@gmail.com>
unread,
Apr 25, 2026, 7:08:23 AMApr 25
to muditha sarojani, Accenture Engineering, teamoxcenture

Pls arrange access permission for the following list. 

No Name ID Num P Num
1 N.U.S.A. Kumara 902962247 V 772910747
2 J D U Weerasinghe 880363638V 779808591
3 NVP Danushka Ruwan 932811227v 704703570
4 K.A Saman Kumara 830871594v 762527661
5 P.D.Terance 773463565V 779320248
6 B.K.S Priyanandana 198530201458 777649968
Vehicle - PC-7436  (Crew Cab)

Best Regards,
Indika Kumara
Oxcenture Engineering 


--
You received this message because you are subscribed to the Google Groups "Team Oxcenture" group.
To unsubscribe from this group and stop receiving emails from it, send an email to teamoxcentur...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/teamoxcenture/000601dcac8d%24115c4c60%243414e520%24%40gmail.com.

oxcenture.muditha@gmail.com

<oxcenture.muditha@gmail.com>
unread,
Apr 25, 2026, 11:20:53 PMApr 25
to oxcenture indika, Accenture Engineering, teamoxcenture

Permission ok

 

Thanking you.

 

Best regards,

Muditha Sarojani

Oxcenture (Pvt) Ltd

Mobile: (+94) 773330970

Email: oxcentur...@gmail.com

Image removed by sender.

~WRD3677.jpg
image009.png
image010.png
image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png

oxcenture indika

<oxcenture.indika@gmail.com>
unread,
May 5, 2026, 6:07:55 AMMay 5
to Eranga Perera, Accenture Engineering, teamoxcenture, muditha sarojani

Dear All,

Installation was completed on 2026 Apr 26. However, the site on-air is still pending due to the following issues:

  1. Dark fiber is not yet ready.
  2. SO power is not yet available.

Kindly arrange the above to proceed with site activation.


Best Regards,
Indika Kumara
Oxcenture Engineering 

On Thu, Mar 5, 2026 at 4:14 PM Eranga Perera <oxcentur...@gmail.com> wrote:
--

oxcenture indika

<oxcenture.indika@gmail.com>
unread,
Jul 5, 2026, 3:22:45 AM (3 days ago) Jul 5
to muditha sarojani, Accenture Engineering, teamoxcenture

Pls arrange access permission for the following list. 

Site - 

Galle_Rd_Hikkaduwa_GA0375-New Site Installation


 BBU pooling site GA5001

No Name ID Num P Num
1 W.B.S. Nuwan Kumara 873252340 V/198732502340 774594189
2 R. Sathis Kumar 962023428 V 772757427
3 NVP Danushka Ruwan 932811227v 704703570
4 T.M. Pethum Chandana 841231139v 776445356
5 L S J Kumara 882870464V 773605361
6 P.D.Terance 773463565V 779320248
7 B.K.S Priyanandana 198530201458 777649968
       
Vehicle - LJ-5862 (xl cab) LN-0544 (XL CAB)    


Best Regards,
Indika Kumara
Oxcenture Engineering 

On Thu, Mar 5, 2026 at 4:14 PM Eranga Perera <oxcentur...@gmail.com> wrote:
--

oxcenture.muditha@gmail.com

<oxcenture.muditha@gmail.com>
unread,
Jul 5, 2026, 6:15:19 AM (3 days ago) Jul 5
to oxcenture indika, Accenture Engineering, teamoxcenture

Dear team,

Permission has been requested

 

Thanking you.

 

Best regards,

Muditha Sarojani

Oxcenture (Pvt) Ltd

Mobile: (+94) 773330970

Email: oxcentur...@gmail.com

 

 

 

From: oxcenture indika <oxcentur...@gmail.com>

Sent: Sunday, July 5, 2026 12:52 PM
To: muditha sarojani <oxcentur...@gmail.com>
Cc: Accenture Engineering <accenture....@gmail.com>; teamoxcenture <teamox...@googlegroups.com>

Image removed by sender.

~WRD0000.jpg
image009.png
image010.png
image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
Reply all
Reply to author
Forward
0 new messages