FW: INH_Western_CM0398_SSC_Ind_4_AP Upgrades_New Site Installation_AP_2026_2337_Event - Upgrade - Task Acceptance

0 views
Skip to first unread message

Eranga Perera

<oxcenture.eranga@gmail.com>
unread,
Jan 24, 2026, 1:21:13 AMJan 24
to teamoxcenture, Accenture Engineering

Ref Updated,

 

202601012

SSC_Ind_4_CM0398-Event Upgrade

AP_2026_2337

Manjula

Western

202601012-1

SSC_Ind_4_CM0398-Event Degrade

AP_2026_2337

Manjula

Western

 

 

 

 

Detailed Project Scope(AP Upgrades) :

 

Common scope

As discussed at the JFS,

Need to install BTS for location 1 & 2

For BTS Locating 1 ,need to install 2 no of BBUs – 2 for FDD.DCS

For BTS Locating 2 ,need to install 2 no of BBUs – 2 for FDD.DCS

Need to get temporary CEB power for both BTS location

Need to facilitate racks for

RRU location 1 – Water Tank – 3Nos  RRU5501s & 2Nos of RRU5258( Fiber - 70 m – 3 Nos )

RRU location 2  - 1Nos RRU5501s & 1Nos of RRU5258 ( Fiber - 10 m – 3 Nos )

RRU location 3 – 1Nos of RRU5501 & 1Nos of RRU5258( Fiber - 10 m – 2 Nos )

Need to facilitate AAU brackets for AAU locations

Brown’s  Pavilion   – 3 DC AAUs   ( Fiber - 70 m – 4 Nos )

SSC Pavilion            – 3 AC AAUs | 2 DC AAUs  ( Fiber - 100 m – 5 Nos )

Singer Pavilion       – 4 AC AAUs ( Fiber - 100 m – 4 Nos )

Gras Bank               -  5 DC AAUs ( Fiber - 100 m – 5 Nos )

Need to facilitate OD cabinets for above BTS Location 1 & 2 .

Antenna & HW Scope

 Need to install 04 No. of 4G BBUs and connect one UMPTe2 & 3nos of UBBPe6 for all eNodeB

 Need to connect RRU and AAU as proposed installation layout

 Need to add 4Nos of new RRU5258 & need to combined with RRU5501

 Need to add 2Nos of new RRU5258, 2nos of RRU5818 & Need to Combined

 Need to combined O/P to NB antenna

 need to config CPRI MUX all eNodeB

 

 

Configuration Scope

2G

Need to add new  4 Nos of 2G BTS of SSC_Ind- CM0398 as proposed below configuration.

SSC_Ind_1-CM0398-D - 2|2|2|2|2|2|2

SSC_Ind_2-CM0398-D - 2|2|2|2|2|2|2

SSC_Ind_3-CM0398-D - 2|2|2|2|2|2|2|2

SSC_Ind_4-CM0398-D - 2|2|2|2|2|2|2

4G – L1800 – 2T2R/15W/20M

SSC_Ind_1-CM0398-H – 1|1|1|1|1|1|1

SSC_Ind_2-CM0398-H – 1|1|1|1|1|1|1

SSC_Ind_3-CM0398-H – 1|1|1|1|1|1|1|1

SSC_Ind_4-CM0398-H – 1|1|1|1|1|1|1

4G – L2100 – 2T2R/15W|10W/15M|10M

SSC_Ind_1-CM0398-H – 1|1|1|1|1|1|1

SSC_Ind_2-CM0398-H – 1|1|1/1|1/1|1/1|1/1|1/1|1/1

SSC_Ind_3-CM0398-H – 1/1|1/1|1/1|1/1|1|1|1/1|1/1

SSC_Ind_4-CM0398-H – 1/1|1/1|1/1|1/1|1/1|1/1|1/1

4G – L2600 – 2T2R – 4T4R /40W/20M

SSC_Ind_1-CM0398-S – 0|1/1/1|1/1/1|1/1/1|1/1/1|1/1/1|1/1/1| ( Last two need to Name As SSC_Ind_1-CM0398-S_A & S_B)

SSC_Ind_2-CM0398-S – 1/1/1|1/1/1|1/1/1|1/1/1|0|0|0

SSC_Ind_3-CM0398-S– 0|0| 1/1/1|1/1/1|1/1/1|1/1/1|0|0

4G – L2300 – 2T2R – 4T4R /40W/20M

SSC_Ind_1-CM0398-S – 0|1/1/1|1/1/1|1/1/1|1/1/1|1/1/1|1/1/1| ( Last two need to Name As SSC_Ind_1-CM0398-S_A & S_B)

SSC_Ind_2-CM0398-S – 0|0|1/1/1|1/1/1|0|0|0|

SSC_Ind_3-CM0398-S– 0|0| 1/1/1|1/1/1|0|0|0|0

 

Required Materials (AP Upgrades) :

 

Material requirement

 BBU5900 - 04 Nos

New RRU5502 -  5Nos

New RRU5258 -  6Nos

New RRU5818 -  2Nos

AAU5942 (DC) -  13Nos

AAU5942 (AC) -  8Nos

UMPTe2 – 04 Nos

 UBBPe4 – 2 Nos

 UBBPg2 – 15 Nos

 NB antenna – 4Nos

 DB combiner(8 I/P ) - 4

 TX Fiber cables(OD) – 150m

 Power Cables(AC) – 150m

 12core Patch Panel(OD)

hybrid coupler -08Nos

 SFP –64 10G Nos

 GPS – 3nos and other Eq

For LP AAU

Fiber - 120 m – 10 Nos

Power - 50 m – 7 Nos

Fiber - 100 m – 8 Nos

Power - 100 m – 3 Nos

Fiber - 50 m – 3 Nos

Power - 50 m – 2 Nos

Power - 60 m – 2 Nos

DAS RRU

Fiber - 100 m – 5 Nos

Power - 100 m – 5 Nos

Fiber - 10 m – 4 Nos

Power - 10m - 4nos

 

 

 

 

 

 

 

 

Thanks & Regards,

Eranga Perera

Project Manager

Oxcenture Eng. PVT LTD

Mobile : 0707334473

 

From: not...@dialog.workhub24.com not...@dialog.workhub24.com
Sent: Friday, January 23, 2026 12:46 PM
To: oxcentur...@gmail.com; oxcenture....@gmail.com
Subject: INH_Western_CM0398_SSC_Ind_4_AP Upgrades_New Site Installation_AP_2026_2337_Event - Upgrade - Task Acceptance

 

Input Task waiting for you

 

 

INH_Western_CM0398_SSC_Ind_4_AP Upgrades_New Site Installation_AP_2026_2337_Event - Upgrade

 

Deadline:

 

 

 

If you’re having trouble clicking the link, copy and paste the URL below into your web browser.

 

 

Thanks,
The WorkHub24 Team

 

 

image001.png
image010.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
image009.png
FW: Event Triggering - CM - ICC Men's T20 World Cup @ Colombo.eml
SSC_Ind_CM0398.xlsx
TX Requirement.csv

oxcenture indika

<oxcenture.indika@gmail.com>
unread,
Feb 24, 2026, 5:49:47 AMFeb 24
to muditha sarojani, Accenture Engineering, Eranga Perera, teamoxcenture

Pls arrange access permission for the following list. 

Date - 2026 Feb 25 - 2026 Feb 28

No Name ID Num P Num
1 K P S Madushanka 870321449V 772025952
2 L S J Kumara 882870464V 773605361
3 P.D.R. Fernando 790422520 V 777331241
4 R. Sathis Kumar 962023428 V 772757427
5 J D U Weerasinghe 880363638V 779808591
6 L A P K Perera 700871347V 777332510
7 N.U.S.A. Kumara 902962247 V 772910747
Vehicle - 58-1098/57-5975

Best Regards,
Indika Kumara
Oxcenture Engineering 


--
You received this message because you are subscribed to the Google Groups "Team Oxcenture" group.
To unsubscribe from this group and stop receiving emails from it, send an email to teamoxcentur...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/teamoxcenture/001b01dc8cf9%249c54c9e0%24d4fe5da0%24%40gmail.com.

oxcenture.muditha@gmail.com

<oxcenture.muditha@gmail.com>
unread,
Feb 24, 2026, 6:30:53 AMFeb 24
to Wishwa Thilakarathna, oxcenture indika, Jerad Nixon, teamoxcenture

Dear Wshwa,

 

Please arrange access permission to above mentioned site from 25th Feb to 05th March 2026

 

Thanking you.

 

Best regards,

Muditha Sarojani

Oxcenture (Pvt) Ltd

Mobile: (+94) 773330970

Email: oxcentur...@gmail.com

Ø Need to install 04 No. of 4G BBUs and connect one UMPTe2 & 3nos of UBBPe6 for all eNodeB

Ø Need to connect RRU and AAU as proposed installation layout

Ø Need to add 4Nos of new RRU5258 & need to combined with RRU5501

Ø Need to add 2Nos of new RRU5258, 2nos of RRU5818 & Need to Combined

Ø Need to combined O/P to NB antenna

Ø need to config CPRI MUX all eNodeB

Ø BBU5900 - 04 Nos

ØNew RRU5502 -  5Nos

ØNew RRU5258 -  6Nos

ØNew RRU5818 -  2Nos

ØAAU5942 (DC) -  13Nos

ØAAU5942 (AC) -  8Nos

ØUMPTe2 – 04 Nos

Ø UBBPe4 – 2 Nos

Ø UBBPg2 – 15 Nos

Ø NB antenna – 4Nos

Ø DB combiner(8 I/P ) - 4

Ø TX Fiber cables(OD) – 150m

Ø Power Cables(AC) – 150m

Ø 12core Patch Panel(OD)

Øhybrid coupler -08Nos

Ø SFP –64 10G Nos

Ø GPS – 3nos and other Eq

Image removed by sender.

image001.png
image010.png
~WRD0005.jpg
image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
image009.png

oxcenture.muditha@gmail.com

<oxcenture.muditha@gmail.com>
unread,
Feb 24, 2026, 6:32:32 AMFeb 24
to Asiri Sandaruwan, asiri.sandaruwan@dns.dialog.lk, teamoxcenture, Wishwa Thilakarathna

Dear Mr.Asiri,

 

Please note that unable to request access permission for bellow-mentioned site due not to include the site ID into the system

 

CM0398_SSC_Ind

 

Please do the needful

 

Thanking you.

 

Best regards,

Muditha Sarojani

Oxcenture (Pvt) Ltd

Mobile: (+94) 773330970

Email: oxcentur...@gmail.com

 

 

 

 

From: oxcenture indika <oxcentur...@gmail.com>

Sent: Tuesday, February 24, 2026 4:19 PM
To: muditha sarojani <oxcentur...@gmail.com>
Cc: Accenture Engineering <accenture....@gmail.com>; Eranga Perera <oxcentur...@gmail.com>; teamoxcenture <teamox...@googlegroups.com>

Ø Need to install 04 No. of 4G BBUs and connect one UMPTe2 & 3nos of UBBPe6 for all eNodeB

Ø Need to connect RRU and AAU as proposed installation layout

Ø Need to add 4Nos of new RRU5258 & need to combined with RRU5501

Ø Need to add 2Nos of new RRU5258, 2nos of RRU5818 & Need to Combined

Ø Need to combined O/P to NB antenna

Ø need to config CPRI MUX all eNodeB

Ø BBU5900 - 04 Nos

ØNew RRU5502 -  5Nos

ØNew RRU5258 -  6Nos

ØNew RRU5818 -  2Nos

ØAAU5942 (DC) -  13Nos

ØAAU5942 (AC) -  8Nos

ØUMPTe2 – 04 Nos

Ø UBBPe4 – 2 Nos

Ø UBBPg2 – 15 Nos

Ø NB antenna – 4Nos

Ø DB combiner(8 I/P ) - 4

Ø TX Fiber cables(OD) – 150m

Ø Power Cables(AC) – 150m

Ø 12core Patch Panel(OD)

Øhybrid coupler -08Nos

Ø SFP –64 10G Nos

Ø GPS – 3nos and other Eq

Image removed by sender.

image001.png
image010.png
~WRD0511.jpg
image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
image009.png

oxcenture indika

<oxcenture.indika@gmail.com>
unread,
Mar 9, 2026, 3:10:12 AMMar 9
to muditha sarojani, Accenture Engineering, teamoxcenture

Pls arrange access permission for the following list. 

Date - 2026 Mar  10 - 2026 Mar 14

No Name ID Num P Num
1 K P S Madushanka 870321449V 772025952
2 L S J Kumara 882870464V 773605361
3
N.U.S.A. Kumara 902962247 V 772910747
4 A.G.S. Kumara 842554721 V/198425504721 778333462
5 NVP Danushka Ruwan 932811227v 704703570
6 ARGTD  Nelumdeniya 200528000302 0769365122
7 B.K.S Priyanandana 198530201458 777649968
Vehicle - 58-1098 /PJ-0183 


Best Regards,
Indika Kumara
Oxcenture Engineering 

On Sat, Jan 24, 2026 at 11:51 AM Eranga Perera <oxcentur...@gmail.com> wrote:
--

Asiri Sandaruwan

<Asiri.Sandaruwan@dialog.lk>
unread,
Mar 10, 2026, 12:31:19 AMMar 10
to oxcenture.muditha@gmail.com, Manjula Rathnayaka, teamoxcenture, Wishwa Thilakarathna

@Manjula Rathnayaka can you pls share the basic site data for this

 

Site ID

Site Name

Lat/long

Tower Type

Site Owner

 

Thanks

//Asiri


Dialog - Internal

From: oxcentur...@gmail.com <oxcentur...@gmail.com>
Sent: Tuesday, February 24, 2026 5:02 PM
To: Asiri Sandaruwan <Asiri.Sa...@dialog.lk>; Asiri Sandaruwan <Asiri.Sa...@dialog.lk>
Cc: 'teamoxcenture' <teamox...@googlegroups.com>; Wishwa Thilakarathna <Wishwa.Thila...@dns.dialog.lk>
Subject: FW: FW: INH_Western_CM0398_SSC_Ind_4_AP Upgrades_New Site Installation_AP_2026_2337_Event - Upgrade - Task Acceptance

 

 

[CAUTION: External Email] Do not click links or open attachments unless you recognize the sender and know the content is safe.

Manjula Rathnayaka

<Manjula.Rathnayaka@dialog.lk>
unread,
Mar 10, 2026, 12:33:24 AMMar 10
to Asiri Sandaruwan, oxcenture.muditha@gmail.com, Sandeepa Dulhara, teamoxcenture, Wishwa Thilakarathna

@Sandeepa Dulhara pls share

 


Dialog - Internal

Sandeepa Dulhara

<Sandeepa.Dulhara@dialog.lk>
unread,
Mar 10, 2026, 12:36:40 AMMar 10
to Manjula Rathnayaka, Asiri Sandaruwan, oxcenture.muditha@gmail.com, teamoxcenture, Wishwa Thilakarathna

 

 

Site ID – TM0398

Site Name - SSC_Ind_4

Lat/long - 6°54'18.16"N/ 79°52'10.89"E

Tower Type – Indoor ( TMP )

Site Owner - DAP

 

 


Dialog - Internal

Asiri Sandaruwan

<Asiri.Sandaruwan@dialog.lk>
unread,
Mar 10, 2026, 12:44:17 AMMar 10
to Sandeepa Dulhara, Manjula Rathnayaka, oxcenture.muditha@gmail.com, teamoxcenture, Wishwa Thilakarathna

Site Data Updated

 

Thanks

//Asiri


Dialog - Internal

oxcenture indika

<oxcenture.indika@gmail.com>
unread,
Mar 27, 2026, 7:00:36 AMMar 27
to muditha sarojani, Eranga Perera, teamoxcenture

Pls arrange access permission for the following list. 
Scope - 5G AAU Removal 

No Name ID Num P Num
1 K P S Madushanka 870321449V 772025952
2 L S J Kumara 882870464V 773605361
3
N.U.S.A. Kumara 902962247 V 772910747
4 A.G.S. Kumara 842554721 V/198425504721 778333462
5 NVP Danushka Ruwan 932811227v 704703570
6 WGP Perera 750705707v 760307197
7 T.M. Pethum Chandana 841231139v 776445356
Vehicle - 57-5975 (Crew cab)

Best Regards,
Indika Kumara
Oxcenture Engineering 

On Sat, Jan 24, 2026 at 11:51 AM Eranga Perera <oxcentur...@gmail.com> wrote:
--

oxcenture indika

<oxcenture.indika@gmail.com>
unread,
Jul 5, 2026, 6:43:23 AM (3 days ago) Jul 5
to muditha sarojani, Accenture Engineering, teamoxcenture

Pls arrange access permission for the following list. 
Scope - RRU Removal 

No Name ID Num P Num
1 W.B.S. Nuwan Kumara 873252340 V/198732502340 774594189
2
R. Sathis Kumar 962023428 V 772757427
3
NVP Danushka Ruwan 932811227v 704703570
4
T.M. Pethum Chandana 841231139v 776445356
5 P.D.Terance 773463565V 779320248
6
K P S Madushanka 870321449V
779914515
7
J D U Weerasinghe 880363638V 779808591
Vehicle - LN-0544 (XL Cab)

Best Regards,
Indika Kumara
Oxcenture Engineering 

On Sat, Jan 24, 2026 at 11:51 AM Eranga Perera <oxcentur...@gmail.com> wrote:
--

oxcenture.muditha@gmail.com

<oxcenture.muditha@gmail.com>
unread,
Jul 6, 2026, 12:29:01 AM (2 days ago) Jul 6
to Wishwa Thilakarathna, teamoxcenture

Dear Wishwa,

 

Please arrange acces permission for the mentiond team for removing RRU from 07th to 10th July 2026

 

Thanking you.

 

Best regards,

Muditha Sarojani

Oxcenture (Pvt) Ltd

Mobile: (+94) 773330970

Email: oxcentur...@gmail.com

 

 

 

 

From: oxcenture indika <oxcentur...@gmail.com>

Sent: Sunday, July 5, 2026 4:13 PM
To: muditha sarojani <oxcentur...@gmail.com>

Ø Need to install 04 No. of 4G BBUs and connect one UMPTe2 & 3nos of UBBPe6 for all eNodeB

Ø Need to connect RRU and AAU as proposed installation layout

Ø Need to add 4Nos of new RRU5258 & need to combined with RRU5501

Ø Need to add 2Nos of new RRU5258, 2nos of RRU5818 & Need to Combined

Ø Need to combined O/P to NB antenna

Ø need to config CPRI MUX all eNodeB

Ø BBU5900 - 04 Nos

ØNew RRU5502 -  5Nos

ØNew RRU5258 -  6Nos

ØNew RRU5818 -  2Nos

ØAAU5942 (DC) -  13Nos

ØAAU5942 (AC) -  8Nos

ØUMPTe2 – 04 Nos

Ø UBBPe4 – 2 Nos

Ø UBBPg2 – 15 Nos

Ø NB antenna – 4Nos

Ø DB combiner(8 I/P ) - 4

Ø TX Fiber cables(OD) – 150m

Ø Power Cables(AC) – 150m

Ø 12core Patch Panel(OD)

Øhybrid coupler -08Nos

Ø SFP –64 10G Nos

Ø GPS – 3nos and other Eq

Image removed by sender.

image001.png
image010.png
~WRD0002.jpg
image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
image009.png
Reply all
Reply to author
Forward
0 new messages