FW: INH_Central_NU0083_Nuwara_Eliy_Twn_East_AP Upgrades_New Sector Addition_AP_2025_1891_Event - Upgrade - Task Acceptance

0 views
Skip to first unread message

oxcenture.eranga@gmail.com

<oxcenture.eranga@gmail.com>
unread,
Aug 24, 2025, 9:35:33 PM8/24/25
to teamoxcenture@googlegroups.com, Accenture Engineering

Ref,

 

  • Event Triggering : Naada Gama Nuwara Eliya [On Air : 3rd September]

 

202508027

Nuwara_Eliy_Twn_East_NU0083-Event Upgrade

AP_2025_1891

Manjula

Central

202508027-1

Nuwara_Eliy_Twn_East_NU0083-Event Degrade

AP_2025_1891

Manjula

Central

202508027-2

Nuwara_Eliy_Twn_East_NU0083-Event Upgrade-Material Supply

AP_2025_1891

Manjula

Central

 

 

 

 

Commissioning Data Details :

 

Cells Define in new Node

UNLOCK with integration UNLOCK

 

 

Detailed Project Scope(AP Upgrades) :

 

New Sector Addition for Event

On Air Target = 3rd Sept

Install Dual Bracket towards 230 side near top level 40m

Install new Penta Beam antenna and New T4 Antenna on these brackets as per below given antenna parameter tables

Connect L18/21 RRUs to Pentabeam and RRU8863 RRU to T4 Antenna

Install new Baseband card and connect these 3 new RRUs to this Baseband

Install GPS and configure GPS clock for this sector

Commission new Sector

Antenna Table

 

 

Required Materials (AP Upgrades) :

 

BB5216 or BB6630 Card - 1 Nos

RRU4499 - 2 Nos

RRU8863 - 1 Nos

Pentabeam Antenna - 1 Nos

T4 Antenna - 1 Nos

RRU4499 to Pentabeam ant jumprs 1m - 8 Nos

RRU8863 to T4 Antenna Jumpers 1m - 8 Nos

8863 to Antenna Cal cable - 1 Nos

DC power cables (60m x 3 ) = 180m

CPRI Outdoor fiber cables 70m = 3 Nos

Ericsson SFP - 6 Nos

GPS Kit - 1 Nos

Cable ties and bonding tapes

 

 

 

 

 

Thanks & Regards,

Eranga Perera

Project Manager
Oxcenture Eng. PVT LTD

 

 

 

From: not...@dialog.workhub24.com <not...@dialog.workhub24.com>
Sent: Sunday, August 24, 2025 12:51 PM
To: oxcentur...@gmail.com; oxcenture....@gmail.com
Subject: INH_Central_NU0083_Nuwara_Eliy_Twn_East_AP Upgrades_New Sector Addition_AP_2025_1891_Event - Upgrade - Task Acceptance

 

Input Task waiting for you

 

 

INH_Central_NU0083_Nuwara_Eliy_Twn_East_AP Upgrades_New Sector Addition_AP_2025_1891_Event - Upgrade

 

Deadline:

 

 

 

If you’re having trouble clicking the link, copy and paste the URL below into your web browser.

 

 

Thanks,
The WorkHub24 Team

 

 

image001.png
image010.png
image002.png
image003.png
image004.png
image005.png
image006.png
image007.png
image008.png
image009.png
Antenna Details.csv
BBU Details.csv
TX Requirement.csv
Re: Event Triggering : Naada Gama Nuwara Eliya [On Air : 3rd September].eml
image003.png
image004.png
image005.jpg
INH_Central_NU0083_Nuwara_Eliy_Twn_East_AP Upgrades_New Sector Addition_AP_2025_1891_Event - Upgrade.eml
image.png

oxcenture.muditha@gmail.com

<oxcenture.muditha@gmail.com>
unread,
Sep 16, 2025, 2:37:52 AM9/16/25
to teamoxcenture@googlegroups.com, Accenture Engineering

Dear team,

Please find the attached UAT

 

Thanking you.

 

Best regards,

Muditha Sarojani

Oxcenture (Pvt) Ltd

Mobile: (+94) 773330970

Email: oxcentur...@gmail.com

Image removed by sender.

--
You received this message because you are subscribed to the Google Groups "Team Oxcenture" group.
To unsubscribe from this group and stop receiving emails from it, send an email to teamoxcentur...@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/teamoxcenture/264001dc1560%2480c155b0%2482440110%24%40gmail.com.

~WRD3985.jpg
image019.png
image020.png
image021.png
image011.png
image012.png
image013.png
image014.png
image015.png
image016.png
image017.png
image018.png
NU0083-Nuwara_Eliy_Twn_East_Event Upgrade-AP_2025_1891_Verified UAT Document.xlsx

Accenture Engineering

<accenture.engineering@gmail.com>
unread,
Jun 13, 2026, 5:48:41 AM (23 hours ago) Jun 13
to oxcenture.eranga@gmail.com, teamoxcenture
Ref updated

202508027-2-Cancelled

Nuwara_Eliy_Twn_East_NU0083-Event Upgrade AP_2025_1891 202508027
Nuwara_Eliy_Twn_East_NU0083-Event Degrade AP_2025_1891 202508027-1
Nuwara_Eliy_Twn_East_NU0083-Event Upgrade-Material Supply AP_2025_1891 202508027-2
Reply all
Reply to author
Forward
0 new messages