Dear @oxcentur...@gmail.com,
Kindly arrange the necessary access permission to carry out the site survey at the Kanthale south_TR0125.
Name | Contact Number | NIC | Company |
U.A.I Kumara | 777624442 | 872490795V | Oxcenture Eng |
K.A Saman Kumara | 766013075 | 830871594V | Oxcenture Eng |
T.M Pethum Chandana | 776445356 | 841231139V | Oxcenture Eng |
Vehicle No | Vehicle Type |
PJ-0183 | Van |
Thanks & Regards,
Eranga Perera
Project Manager
Oxcenture Eng. PVT LTD
Mobile : 0707334473
From: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>
Sent: Tuesday, June 9, 2026 12:31 PM
To: Suranga Marasinghe <Suranga.M...@dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>; Mohamed Rizmy <Rizmy....@dns.dialog.lk>; oxcentur...@gmail.com
Cc: Ravindu Thennakoon <Ravindu.T...@dns.dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Lakmal Madushanka <Lakmal.M...@dialog.lk>; Waruna Bandara <Waruna....@dns.dialog.lk>; Harshadewa Ekanayaka <harshadewa...@dns.dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission- TR0125 Kanthale south
@Eranga Perera pls proceed with the movement to the temp MTU asap. Pls plan and inform the date.
Best Regards,
Pasan Athurugiriya
Dialog - Internal
From: Suranga Marasinghe <Suranga.M...@dialog.lk>
Sent: Monday, June 8, 2026 11:37 AM
To: Ranpath Perera <Ranpath...@dialog.lk>; Mohamed Rizmy <Rizmy....@dns.dialog.lk>
Cc: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Ravindu Thennakoon <Ravindu.T...@dns.dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Lakmal Madushanka <Lakmal.M...@dialog.lk>; Waruna Bandara <Waruna....@dns.dialog.lk>; Harshadewa Ekanayaka <harshadewa...@dns.dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>
Subject: Re: MTU Replacement Project - TRC Submission- TR0125 Kanthale south
Good news. Let's make the project concluded as planned.
Dialog - Internal
From: Ranpath Perera <Ranpath...@dialog.lk>
Sent: Monday, June 8, 2026 11:33 AM
To: Suranga Marasinghe <Suranga.M...@dialog.lk>; Mohamed Rizmy <Rizmy....@dns.dialog.lk>
Cc: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Ravindu Thennakoon <Ravindu.T...@dns.dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Lakmal Madushanka <Lakmal.M...@dialog.lk>; Waruna Bandara <Waruna....@dns.dialog.lk>; Harshadewa Ekanayaka <harshadewa...@dns.dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission- TR0125 Kanthale south
Temp commercial power connected , pls process the relocation
Dialog - Internal
From: Suranga Marasinghe <Suranga.M...@dialog.lk>
Sent: Monday, May 18, 2026 8:03 PM
To: Ranpath Perera <Ranpath...@dialog.lk>; Mohamed Rizmy <Rizmy....@dns.dialog.lk>
Cc: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Ravindu Thennakoon <Ravindu.T...@dns.dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Lakmal Madushanka <Lakmal.M...@dialog.lk>; Waruna Bandara <Waruna....@dns.dialog.lk>; Harshadewa Ekanayaka <harshadewa...@dns.dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>
Subject: Re: MTU Replacement Project - TRC Submission- TR0125 Kanthale south
Have we contacted CEB high level to check on possible power connection date ?
Dialog - Internal
From: Ranpath Perera <Ranpath...@dialog.lk>
Sent: Monday, May 18, 2026 12:32 PM
To: Suranga Marasinghe <Suranga.M...@dialog.lk>; Mohamed Rizmy <Rizmy....@dns.dialog.lk>
Cc: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Ravindu Thennakoon <Ravindu.T...@dns.dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Lakmal Madushanka <Lakmal.M...@dialog.lk>; Waruna Bandara <Waruna....@dns.dialog.lk>; Harshadewa Ekanayaka <harshadewa...@dns.dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission- TR0125 Kanthale south
CEB payment done FYI
Dialog - Internal
From: Suranga Marasinghe <Suranga.M...@dialog.lk>
Sent: Friday, May 15, 2026 7:35 AM
To: Ranpath Perera <Ranpath...@dialog.lk>; Mohamed Rizmy <Rizmy....@dns.dialog.lk>
Cc: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Ravindu Thennakoon <Ravindu.T...@dns.dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Lakmal Madushanka <Lakmal.M...@dialog.lk>; Waruna Bandara <Waruna....@dns.dialog.lk>; Harshadewa Ekanayaka <harshadewa...@dns.dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>
Subject: Re: MTU Replacement Project - TRC Submission- TR0125 Kanthale south
Rizmy confirmed that SO gave the consent for 3 months. Please proceed the payment today & expedite the connection.
Dialog - Internal
From: Ranpath Perera <Ranpath...@dialog.lk>
Sent: Thursday, May 14, 2026 11:25 PM
To: Mohamed Rizmy <Rizmy....@dns.dialog.lk>; Suranga Marasinghe <Suranga.M...@dialog.lk>
Cc: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Ravindu Thennakoon <Ravindu.T...@dns.dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Lakmal Madushanka <Lakmal.M...@dialog.lk>; Waruna Bandara <Waruna....@dns.dialog.lk>; Harshadewa Ekanayaka <harshadewa...@dns.dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission- TR0125 Kanthale south
Dear @Mohamed Rizmy pls get SO consent within tomorrow or within weekend. I ll pay EST on Monday
Dear @Suranga seems FTG installation not practical , we have already invested 1Mn for 4months Temp power source. Will take region support to speedup the PAQ.
Dialog - Internal
From: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>
Sent: Thursday, May 14, 2026 3:54 PM
To: Ranpath Perera <Ranpath...@dialog.lk>; Mohamed Rizmy <Rizmy....@dns.dialog.lk>; Ravindu Thennakoon <Ravindu.T...@dns.dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Lakmal Madushanka <Lakmal.M...@dialog.lk>; Waruna Bandara <Waruna....@dns.dialog.lk>; Harshadewa Ekanayaka <harshadewa...@dns.dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Suranga Marasinghe <Suranga.M...@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission- TR0125 Kanthale south
Dear Suranga,
Based on the Civil and PSP feedback below is the best practical timeline required. Therefore need the below to be negotiaed with SO after which Ranpath needs to trigger for the PIV payment.
Temporary Power readiness after PIV payment – 1 month (1 week before need to install STBG)
MTU removal & Tower construction – 2 months
Cutover, removal – 0.5 months
Total – 3.5 months
Best Regards,
Pasan Athurugiriya
Dialog - Internal
-----Original Appointment-----
From: Pasan Athurugiriya
Sent: Monday, May 11, 2026 10:51 AM
To: Ranpath Perera; Mohamed Rizmy; Ravindu Thennakoon; Rehan Mohamed; Jayanthan Thiruchchittampalam; Lakmal Madushanka; Waruna Bandara; Harshadewa Ekanayaka; Vihanga Wickramaarachchilage; Suranga Marasinghe
Subject: MTU Replacement Project - TRC Submission- TR0125 Kanthale south
When: Monday, May 11, 2026 4:00 PM-4:30 PM (UTC+05:30) Sri Jayawardenepura.
Where: Microsoft Teams Meeting
Dear All,
Pls hop on the quick call to discuss this.
Regards,
Pasan Athurugiriya
Microsoft Teams meeting
Meeting ID: 487 647 960 122 46
Passcode: JD9Mx6FJ
For organizers: Meeting options
_____________________________________________
From: Pasan Athurugiriya
Sent: Wednesday, April 29, 2026 1:59 PM
To: Ranpath Perera <Ranpath...@dialog.lk>; Mohamed Rizmy <Rizmy....@dns.dialog.lk>; Ravindu Thennakoon <ravindu.t...@dns.dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Lakmal Madushanka <Lakmal.M...@dialog.lk>
Cc: Waruna Bandara <Waruna....@dns.dialog.lk>; Harshadewa Ekanayaka <harshadewa...@dns.dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Prasanna Suriyaarachchige <Prasanna.Sur...@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission- TR0125 Kanthale south
Dear Rizmy/Lakmal/Prasanna,
Based on the feedback from PSP, civil etc it seems will need extension of about 5 months starting now. Pls assist with this.
Temporary Power readiness after PIV payment – 1 month
Tower construction – 3 months
Cutover, removal – 1 month
Hope you can negotiate with the SO on this.
Note - CEB approval for temporary connection was a tough task as they were not willing to give with same feeder. PSP had to do negotiate with correspondence at length to convince to get the temp connection with 1Mn in payment.
Best Regards,
Pasan Athurugiriya
From: Ranpath Perera <Ranpath...@dialog.lk>
Sent: Sunday, April 26, 2026 12:31 PM
To: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Mohamed Rizmy <Rizmy....@dns.dialog.lk>; Ravindu Thennakoon <Ravindu.T...@dns.dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>
Cc: Waruna Bandara <Waruna....@dns.dialog.lk>; Harshadewa Ekanayaka <harshadewa...@dns.dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Prasanna Suriyaarachchige <Prasanna.Sur...@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission- TR0125 Kanthale south
Just received Kanthale South PIV for Temp power (1Mn)
Need SAQ & Civil direction before proceed for payment.
Dialog - Internal
From: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>
Sent: Friday, April 24, 2026 3:28 PM
To: Mohamed Rizmy <Rizmy....@dns.dialog.lk>; Ravindu Thennakoon <Ravindu.T...@dns.dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>
Cc: Waruna Bandara <Waruna....@dns.dialog.lk>; Harshadewa Ekanayaka <harshadewa...@dns.dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Prasanna Suriyaarachchige <Prasanna.Sur...@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission- TR0125 Kanthale south
@Ranpath Perera what is the status of the temporary power setup? Seems the land over is requesting to take down the temp mtu
Best Regards,
Pasan Athurugiriya
Dialog - Internal
From: Mohamed Rizmy <Rizmy....@dns.dialog.lk>
Sent: Friday, April 24, 2026 12:11 PM
To: Ravindu Thennakoon <Ravindu.T...@dns.dialog.lk>; Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>
Cc: Waruna Bandara <Waruna....@dns.dialog.lk>; Harshadewa Ekanayaka <harshadewa...@dns.dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Prasanna Suriyaarachchige <Prasanna.Sur...@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission- TR0125 Kanthale south
Kanthale South temp Land owner has requested the return of the temporary land space he has given for 4 months. The agreed time period is now over, and they need to begin house constriction on the land.
We must return the land space to land owner as agreed .
Dialog - Internal
From: Ravindu Thennakoon <Ravindu.T...@dns.dialog.lk>
Sent: Thursday, April 9, 2026 9:59 PM
To: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>
Cc: Waruna Bandara <Waruna....@dns.dialog.lk>; Harshadewa Ekanayaka <harshadewa...@dns.dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Mohamed Rizmy <Rizmy....@dns.dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission
Dear @Pasan Athurugiriya and All,
Any update ? Still antenna shifting works pending. No progress has been observed since the completion of the temporary tower civil works on 9th January 2026—nearly three months ago.
Please review the status and take the necessary steps to expedite the work.
Best Regards,
Ravindu Thennakoon
Dialog - Internal
From: Ravindu Thennakoon <Ravindu.T...@dns.dialog.lk>
Sent: Friday, January 9, 2026 12:55 PM
To: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>
Cc: Udana Amarasuriya <Udana.Am...@dialog.lk>; Waruna Bandara <Waruna....@dns.dialog.lk>; Harshadewa Ekanayaka <harshadewa...@dns.dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Mohamed Rizmy <Rizmy....@dns.dialog.lk>
Subject: Re: MTU Replacement Project - TRC Submission
Dear Pasan / Rehan,
Below site temporary tower erection and temporary M/C installation completed (Total civil works completed).
Please arrange the required necessary arrangements to relocate the antennas to the temporary tower.
DAP Site ID | DAP Site Name |
TR0125 | Kanthale south |
Dear Jayanthan,
FYI and FYA.
Best Regards,
Ravindu Thennakoon
From: Ravindu Thennakoon <Ravindu.T...@dns.dialog.lk>
Sent: Friday, January 2, 2026 7:16 AM
To: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Mohamed Rizmy <Rizmy....@dns.dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>
Cc: Udana Amarasuriya <Udana.Am...@dialog.lk>; Waruna Bandara <Waruna....@dns.dialog.lk>; Harshadewa Ekanayaka <harshadewa...@dns.dialog.lk>
Subject: Re: MTU Replacement Project - TRC Submission
Dear Rizmy / Vihanga
Civil team plan to start Kanthale south - TR0125 Temporary tower construction works on 04/01/2025.
Please inform relevant parties.
Dear jayanthan / Pasan,
FYI and FYA.
Best Regards,
Ravindu Thennakoon
From: Ravindu Thennakoon
Sent: Wednesday, October 22, 2025 8:26:14 AM
To: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Mohamed Rizmy <Rizmy....@dns.dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Rehan Mohamed <Rehan....@dialog.lk>
Cc: Udana Amarasuriya <Udana.Am...@dialog.lk>; Waruna Bandara <Waruna....@dns.dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission
Dear Vihanga / Rizmy,
Could you please confirm the possibility of proceeding with the Temporary MTU installation and the commencement of the new GBT site construction?
The Civil team is ready to begin the temporary tower installation. Before temporary tower installation need to handover the permanent tower.
DAP Site ID | DAP Site Name |
TR0083 | Alankerny |
TR0125 | Kanthale south |
Dear @Pasan Athurugiriya,
FYI and FYA.
Best Regards,
Ravindu Thennakoon
From: Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>
Sent: Wednesday, October 8, 2025 12:09 PM
To: Civil Regional Team - DNS <CivilReg...@dialog.lk>
Cc: Udana Amarasuriya <Udana.Am...@dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; Kapila Gunawardhana <Kapila.Gu...@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>; Dhanushka S. Senanayake <Dhanushka....@dialog.lk>; Pasan Athurugiriya <Pasan.Ath...@dialog.lk>
Subject: FW: MTU Replacement Project - TRC Submission
Dear Team,
Please proceed the construction works in below sites. Already TRC submission completed sites.
Please keep close communication with region SAQ officer
DAP Site ID | DAP Site Name |
CM2494 | Galawila_West |
CM2495 | Siyambalagoda_North |
HA0197 | Sippukulam |
JA0310 | Manduvil |
AM0168 | Addaippaliam_Town |
AM0073 | Thambiluvil |
BA0050 | Kaluthavalai |
BA0132 | Batti_Uppodai |
JA0020 | Kokuwil_Town |
TR0083 | Alankerny |
JA0017 | Achchuveli MTU |
VA0018 | Pandarikulam |
AN0196 | Dunamadalawa |
CM0943 | Thalangama |
GM0514 | Pamunugama North |
GM0513 | Nugape West |
KA0093 | Gannoruwa SLA |
NU0011 | Pattipola |
TR0196 | Kinniya_Echanteevu |
JA0307 | Madduvil North |
Thanks
Jaya
Dialog - Internal
From: Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>
Sent: Tuesday, October 7, 2025 4:40 PM
To: SAQ Region team <SAQ...@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>
Cc: Lakmal Madushanka <Lakmal.M...@dialog.lk>; Prasanna Suriyaarachchige <Prasanna.Sur...@dialog.lk>; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>; Imendra Weragala <Imendra....@dialog.lk>; Chathuranga Premachandra <Chathuranga....@dialog.lk>; Kapila Gunawardhana <Kapila.Gu...@dialog.lk>; Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission
Dear SAQ Team,
Please find the attached letters received from TRC for 08 sites. As per the Snr Mgt direction, please coordinate with the civil team & do the needful for further proceedings.
In case of any objections from authorities , will handle case by case.
# | DAP Site ID | DAP Site Name | AT Name |
1 | CM2494 | Galawila_West | COL_Rukmalgama_01 |
2 | CM2495 | Siyambalagoda_North | COL_Siyambalagoda_01 |
3 | HA0197 | Sippukulam | HAM_Sippikulama_01 |
4 | JA0310 | Manduvil | JAF_Sangaththanai_01 |
5 | BA0132 | Batti_Uppodai | BAT_Uppodai_01 |
6 | JA0017 | Achchuveli MTU |
|
7 | GM0513 | Nugape West | |
8 | JA0307 | Madduvil North | Madduvil_01 |
Thx
Vihanga
Dialog - Internal
From: Vihanga Wickramaarachchilage
Sent: Friday, October 3, 2025 4:21 PM
To: Kapila Gunawardhana <Kapila.Gu...@dialog.lk>; Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>; SAQ Region team <SAQ...@dialog.lk>; Prasanna Suriyaarachchige <Prasanna.Sur...@dialog.lk>
Cc: Lakmal Madushanka <Lakmal.M...@dialog.lk>; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>; Imendra Weragala <Imendra....@dialog.lk>; Chathuranga Premachandra <Chathuranga....@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission
Importance: High
Update !
TRC revert the below process mentioned earlier & informed today that TRC will issue a letter to all authorities about the structure change.
If the authorities have any objections, they must respond to the TRC within two weeks. Otherwise, TRC will issue the final clearance to us. letters for the following 07 sites will be issued by Thursday.
# | DAP Site ID | DAP Site Name |
1 | CM2494 | Galawila_West |
2 | HA0197 | Sippukulam |
3 | JA0310 | Manduvil |
4 | JA0307 | Madduvil North |
5 | CM2495 | Siyambalagoda_North |
6 | JA0017 | Achchuveli |
7 | GM0513 | Nugape West |
Thx
Vihanga
From: Kapila Gunawardhana <Kapila.Gu...@dialog.lk>
Sent: Friday, October 3, 2025 12:56 PM
To: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>
Cc: Lakmal Madushanka <Lakmal.M...@dialog.lk>; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>; Imendra Weragala <Imendra....@dialog.lk>; Chathuranga Premachandra <Chathuranga....@dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; SAQ Region team <SAQ...@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Prasanna Suriyaarachchige <Prasanna.Sur...@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission
We will discuss today
Dialog - Internal
From: Pasan Athurugiriya <Pasan.Ath...@dialog.lk>
Sent: Thursday, October 2, 2025 12:15 PM
To: Kapila Gunawardhana <Kapila.Gu...@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>
Cc: Lakmal Madushanka <Lakmal.M...@dialog.lk>; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>; Imendra Weragala <Imendra....@dialog.lk>; Chathuranga Premachandra <Chathuranga....@dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; SAQ Region team <SAQ...@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Prasanna Suriyaarachchige <Prasanna.Sur...@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission
Dear Kapila/Koshala,
Kind reminder on below direction..
Best Regards,
Pasan Athurugiriya
Dialog - Internal
From: Pasan Athurugiriya
Sent: Thursday, September 25, 2025 11:17 AM
To: Kapila Gunawardhana <Kapila.Gu...@dialog.lk>; Koshala Chandralal <koshala.c...@dialog.lk>
Cc: Lakmal Madushanka <Lakmal.M...@dialog.lk>; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>; Imendra Weragala <Imendra....@dialog.lk>; Chathuranga Premachandra <Chathuranga....@dialog.lk>; Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>; SAQ Region team <SAQ...@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Prasanna Suriyaarachchige <Prasanna.Sur...@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission
Dear Kapila/Koshala,
At the moment there is no clear direction from TRC on how to clear the sites that are with TRC approval. All in all there are 20+ sites. Pls advice on a way to expedite. Attached is a sample site for which TRC has forwarded to the other authorities to provide their input/approval
Best Regards,
Pasan Athurugiriya
From: Vihanga Wickramaarachchilage <vihanga.wickra...@dialog.lk>
Sent: Wednesday, September 24, 2025 5:43 PM
To: SAQ Region team <SAQ...@dialog.lk>; Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>; Kapila Gunawardhana <Kapila.Gu...@dialog.lk>; Prasanna Suriyaarachchige <Prasanna.Sur...@dialog.lk>
Cc: Lakmal Madushanka <Lakmal.M...@dialog.lk>; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>; Imendra Weragala <Imendra....@dialog.lk>; Chathuranga Premachandra <Chathuranga....@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission
Dear All,
Sample letter received from TRC relevant to the update given in last week below. Refer attached.
We need to follow up and obtain the No Objection from all authorities(MOD/CAA/UDA/BOI) similarly as New Site prior to get the TRC Final Clearance.
Thx
Vihanga
Dialog - Internal
From: Vihanga Wickramaarachchilage
Sent: Thursday, September 18, 2025 12:45 PM
To: SAQ Region team <SAQ...@dialog.lk>; Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>
Cc: Prasanna Suriyaarachchige <Prasanna.Sur...@dialog.lk>; Lakmal Madushanka <Lakmal.M...@dialog.lk>; Kapila Gunawardhana <Kapila.Gu...@dialog.lk>; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>; Imendra Weragala <Imendra....@dialog.lk>; Chathuranga Premachandra <Chathuranga....@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission
Importance: High
Dear All – For your update.
TRC informed that they are not in a position to issue the clearance for Tower Structural change & TRC will write to all authorities(MOD, CAA, UDA, BOI) & need to get their No objection first.
Once the no-objection is received from the authorities, TRC will issue the clearance, which may take considerable time.
Thx
Vihanga
From: Vihanga Wickramaarachchilage
Sent: Tuesday, September 2, 2025 10:25 AM
To: SAQ Region team <SAQ...@dialog.lk>; Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>
Cc: Prasanna Suriyaarachchige <Prasanna.Sur...@dialog.lk>; Lakmal Madushanka <Lakmal.M...@dialog.lk>; Kapila Gunawardhana <Kapila.Gu...@dialog.lk>; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>; Imendra Weragala <Imendra....@dialog.lk>; Chathuranga Premachandra <Chathuranga....@dialog.lk>
Subject: RE: MTU Replacement Project - TRC Submission
@SAQ Region team @Pasan Athurugiriya @Jayanthan Thiruchchittampalam – FYI & update.
Re request for the Batch 02 & 03 sites under Batch 04 submitted to TRC today. In total 20 sites submitted.
Batch 04
# | DAP Site ID | DAP Site Name | Site Owner | AT Name | TRC Batch |
1 | JA0020 | Kokuwil_Town | Airtel | JAF_Kokuvil_02 | Batch 4 |
2 | NU0011 | Pattipola | DAP | - | Batch 4 |
3 | CM0145 | Katubedda | DAP | - | Batch 4 |
From: Vihanga Wickramaarachchilage
Sent: Tuesday, August 26, 2025 12:19 PM
To: SAQ Region team <SAQ...@dialog.lk>; Pasan Athurugiriya <Pasan.Ath...@dialog.lk>; Jayanthan Thiruchchittampalam <Jayanthan.Thir...@dialog.lk>
Cc: Prasanna Suriyaarachchige <Prasanna.Sur...@dialog.lk>; Lakmal Madushanka <Lakmal.M...@dialog.lk>; Kapila Gunawardhana <Kapila.Gu...@dialog.lk>; Manjula Rathnayaka <Manjula.R...@dialog.lk>; Ranpath Perera <Ranpath...@dialog.lk>; Imendra Weragala <Imendra....@dialog.lk>
Subject: MTU Replacement Project - TRC Submission
Importance: High
Dear Region Team,
As discussed in the last meeting, MTU replacement requests submitted to TRC for below 11 sites(Batch 01 & 03) & Re-request for the batch 02 to be submitted within this week.
All the LA drawings will be couriered to you to be prepare with LA Approvals.
@Pasan Athurugiriya @Jayanthan Thiruchchittampalam - FYI
# | DAP Site ID | DAP Site Name | Site Owner | AT Name | TRC Batch | TRC feedback |
1 | CM2494 | Galawila_West | Airtel | COL_Rukmalgama_01 | Batch 1 | Initial Request submitted on 9th July & TRC requested ER, SR & undertaking. Re request submitted today |
2 | CM2495 | Siyambalagoda_North | Airtel | COL_Siyambalagoda_01 | Batch 1 | |
3 | HA0197 | Sippukulam | Airtel | HAM_Sippikulama_01 | Batch 1 | |
4 | JA0017 | Achchuveli | DAP |
| Batch 1 | |
5 | VA0018 | Pandarikulam | DAP |
| Batch 1 | |
6 | AM0168 | Addaippaliam_Town | Airtel | AMP_Addapallam_01 | Batch 3 | New request – Submitted today |
7 | BA0132 | Batti_Uppodai | Airtel | BAT_Uppodai_01 | Batch 3 | |
8 | TR0083 | Alankerny | Airtel | TRI_Periyakinniya_05 | Batch 3 | |
9 | AN0196 | Dunamadalawa | DAP |
| Batch 3 | |
10 | CM0943 | Thalangama | DAP |
| Batch 3 | |
11 | GM0514 | Pamunugama North | DAP |
| Batch 3 | |
12 | JA0310 | Manduvil | Airtel | JAF_Sangaththanai_01 | Batch 2 | Initial Request submitted on 28th July & TRC requested ER, SR & undertaking. Re request to be submitted within this week |
13 | AM0073 | Thambiluvil | Airtel | AMP_Thirukkovil_02 | Batch 2 | |
14 | BA0050 | Kaluthavalai | Airtel | BAT_Eruvil-Pattu_01 | Batch 2 | |
15 | GM0513 | Nugape West | DAP |
| Batch 2 | |
16 | KA0093 | Gannoruwa SLA | DAP |
| Batch 2 | |
17 | JA0307 | Madduvil North | Airtel | Madduvil_01 | Batch 2 |
Thx
Vihanga
Dialog - Internal
Dear team,
Permission has been requested
Ref;

Thanking you.
Best regards,
| Muditha Sarojani Oxcenture (Pvt) Ltd Mobile: (+94) 773330970 Email: oxcentur...@gmail.com |