Here are 5 thoughts off the top of my head:
1. Someone let the Mayor know that one of the children of a person
regularly attending our G+W meetings had a traumatic near miss.
2. Print up 20-40 durable signs (I, for one, would chip in for this),
and nail them high on all the telephone saying "SLOW DOWN FOR THE
CHILDREN!" - and try to get some permission to do so.
3. * Someone ask Tufts to accelerate their study in light of this -
even it means there needing to put in more $.
4. Just take the already allocated 40k and build 2 raised crosswalk -
one by the church - and one by g+w (both east-west) and then let the
tufts study work around those. I believe this was something like
option B - but I could look it up.
5. Ask the Mayor to get more $$ in the pipeline now in anticipation
of the Tufts study so when's it's ready it can be built faster.
* I personally was hoping last time we met w/ Tufts they would be
coming back with the study itself vs the schedule for it. Lol.