Groups
Groups
Sign in
Groups
Groups
阳光软件.TDV软件技术论坛
Conversations
About
Send feedback
Help
关于如何得到时程计算的每个时间子步下各项内力的数值
16 views
Skip to first unread message
wangke81168720
unread,
Mar 30, 2009, 2:14:21 AM
3/30/09
Reply to author
Sign in to reply to author
Forward
Sign in to forward
Delete
You do not have permission to delete messages in this group
Copy link
Report message
Show original message
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to 332184992, 172947448, 外部论坛, 内部论坛
周工
,你好!
在时程时程计算命令对应的参数中,有一个关于RM设置的信息,指定后,用户可以得到时程计算过程,某单元或节点的位移内力沿时间历程的变化,如附图1.gif所示。
如附件tint.rar示例,现在在RM设置中,添加4号单元弯矩Mz沿时间的变化,如附图2.gif所示,计算完成后,在工程目录的 DefaultSchedule目录中的tint_out.lst文件中,便可查看到每个时间步单元起始端和末端的弯矩Mz,如附图3.gif所示。
wangke81168720
2009-03-30
tint.rar
附图3.GIF
附图1.GIF
附图2.GIF
Reply all
Reply to author
Forward
0 new messages