On Sat, Apr 9, 2011 at 8:41 PM, X_we12 <
wdu...@gmail.com> wrote:
> Current situation:
> rate is set to 120 per day.
> Task 1 is 1h --> cost results in 15.
> Task 2 is 0.5h --> cost results in 15.
>
> Desired situation
> rate is set to 120 per day.
> Task 1 is 1h --> cost results in 15.
> Task 2 is 0.5h --> cost results in 7.5.
> Task 3 is set to 10min --> cost results in 2.5.