Google Groups no longer supports new Usenet posts or subscriptions. Historical content remains viewable.
Dismiss

Evans Library Closes 3rd Floor Due to Construction

0 views
Skip to first unread message

dae...@cs.tamu.edu

unread,
Oct 3, 1999, 3:00:00 AM10/3/99
to
Please share the following information with your colleagues.

Effective immediately the 3rd floor of the Sterling C. Evans Library will
close temporarily due to construction-related activity. The closing is
effective immediately. Paging of materials on this floor will
cease. There will be no elevator access, and library personnel will not be
allowed on the floor. Testing to assure safety will take place during the
closing. Once results are confirmed and safety is assured, the 3rd floor
will reopen. Anticipated reopening time is noon Saturday, October 2. Call
numbers affected by this closing are QK/1/A1-Z/999, Dewey 001-999.99/Z9,
Theses and Dissertations, National Union and Folios. Library staff on the
4th floor of Evans and the 5th floor of the Annex will be available to
assist patrons.

--
This article was posted automatically. If email replies are necessary, please
send them to the individual noted in the article. Do not reply to 'daemon'.

0 new messages