Dam Bad
unread,Jun 9, 2026, 4:42:24 PM (10 hours ago) Jun 9Sign in to reply to author
Sign in to forward
You do not have permission to delete messages in this group
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to SWAT-user
Hello everyone,
I wanted to design a weir in one of the subbasins. In the pond editor (SWAT Editor 2012 -> Subbasin data -> Pond (pnd)), I only edited the “pond” parameters. Then I ran “Re-write SWAT input files.” The differences between the output.sub file with and without ponds were noticeable. However, when I additionally selected Urban BMPs - Detention Ponds in Pond (pnd), where I could set the weir parameters, the results were identical to those for the ponds alone. Why didn’t anything change? I even set the weir parameters higher than necessary. I should add that after setting the weir parameters, an additional *.dpd file was created, whose path is also saved in the *.pnd file corresponding to the given watershed. What could be wrong?