Hi
I am using RCM Data(CCNM-CERFACS-CNRM-CM5, CSIRO-QCCCE-CSIRO-Mk3-6-0 from IITM Institue). Whenever I input my data which is up to the year 2099 it automatically shows the end date as the year 1999, due to this problem SWAT Model Run could not possible.
I am unable to figure out what is the issue here, please someone help me figure this out.
I have attached a screenshot to better understand my problem.
Thanks
Soubhagya Laxmi Ray
M.Tech in Soil and Water Conservation Engineering