Thanks for the reply Yipei. Appreciate it!
Sent from Mail for Windows 10
From: Yipei Wen
Sent: Monday, December 3, 2018 1:42 PM
To: farhana raffar
Subject: RE: [SWAT-user:8565] Planting and harvesting dates
Try editing your management file (.mgt or whatever it calls, in ArcSWAT it’s called management). In this file you can add management operations.
See the screen shot. The operation schedule is what you need to edit. You will need to check some document to find out the code for your operation. In my screenshot, the operation is to plant a 10 years tree with potential heat unit of 2200 and initial biomass of 13000 when heat unit reaches 0.0%. One of those “1” is year 1, another is operation order “1”, and I can’t recall what’s the other 1. You can do similar things like add a harvest operation after this then following another planting and harvest operation.
Using ArcSWAT will be more straightforward in this portion, and can avoid those confusing operation code number.
Good luck and have fun.
Yipei
Sent from Mail for Windows 10
--
You received this message because you are subscribed to the Google Groups "SWAT-user" group.
To unsubscribe from this group and stop receiving emails from it, send an email to swatuser+u...@googlegroups.com.
To post to this group, send email to swat...@googlegroups.com.
Visit this group at https://groups.google.com/group/swatuser.
For more options, visit https://groups.google.com/d/optout.