Hello everyone,
Despite a successfull run /decent water balance/ consequent generation of surface runoff : there is no production of erosion for any HRU at any timestep on my swat + project on a subdaily timestep (hourly)
There is probably something I miss but i already tried a few things in 4.
4. Description of Issue
- The Problem and steps to reproduce
*I checked every component of the musle equation that i could except the peak_rate (erosion.out is empty).
*Some hrus have a slope of 0 but not all.
*Tried with and without Green-Ampt equation.
*Works with another project on daily scale on the same swat version.
1. Primary Issue Location
- Component: (SWAT+ Editor, SWAT+ Executable, or Model Functionality)
- Area of impact: (model output)
2. Software Versions
- SWAT+ Editor 3.14: * SWAT+ Revision 61.0.2
3. Project Characteristics
- Watershed Details: 5000 hru, 200 km² watershed, hourly pcp, a lot of different LAND-USE (urban, forest, corn)
- Modeling Aim: (daily discharge and erosion)
Thanks in advance for any input
Best,
Adrien