HIROKAZU FUKUI
unread,Jun 30, 2025, 9:12:07 AM6/30/25Sign in to reply to author
Sign in to forward
You do not have permission to delete messages in this group
Either email addresses are anonymous for this group or you need the view member email addresses permission to view the original message
to SWAT+ Editor
Dear All,
I'm conducting SWAT simulation to evaluate soil erosion.
I have some trouble calculating USLE (unit: tons) in QSWAT+3.0.3 and SWAT+ Editor 3.0.8.
I have successfully done STEP1, watershed delineation, and STEP2, Creating HRUs.
Then I have run the SWAT model using the SWAT+ Editor without any problems, but no values for USLE in TxtInOut, for example “hru_ls_mon” text file, were obtained, and just zero values were obtained.
Though I would like to know USLE values, could you tell me how to do that?
Best regards,
Hiro