Hello everyone,

3 views
Skip to first unread message

Doaa Hegazy

unread,
Nov 11, 2025, 10:48:48 AM (3 days ago) Nov 11
to SWAT+ Editor
 I’m having trouble getting reservoirs to work in SWAT+. I have set up 2 reservoirs, and I think I have defined all required files (hydrology, initial conditions, and decision table) completely to zero for all variables and all time steps. I have attached all the  reservoir files .
  • Is there a known issue with SWAT+ rev61.0.1 (together with Editor v3.0.8) where initial.res / initial.wet are not read and reservoirs start with zero volume?

  • If so, which combination of SWAT+ executable revision and Editor version do you recommend for projects that use reservoirs with decision tables and non-zero initial volume?

  • Is there anything obviously wrong in the way I am linking reservoir.res, initial.res, hydrology.res, and the decision table that would explain why reservoir_mon.csv is all zeros?

res_rel.dtl
reservoir.res
initial.res
reservoir.con
res_dr.swf
hydrology.res
res_dat.swf
reservoir_mon.csv
Reply all
Reply to author
Forward
0 new messages