I am using ArcSWAT since last 3 years. Now I am facing problem in another watershed delineation.
Actually, my watershed area is 190,000 km^2 with elevation ranges from 300-8000 meter and I am using DEM 30x30 meter resolution with total size of dem in 1.8 GB. 
In water delineation step it proceed only upto 57% and stop working....and I left it to do it completely but after  8/9 hours it was still at 57%. 
When I see the ArcGIS in the task manager of my computer....it shows ArcGIS is not responding.... 
why?
Is the size of DEM is high?
Or I have to use QGIS with QSWAT?
Any expert opinion.... thanks in anticipation.

Natalja C.

unread,
Dec 4, 2020, 5:07:45 AM12/4/20
to SWAT-CUP
Hello,
8/9 hours is too little time for such a task. Depending on your machine, it will run anywhere from a couple of days to couple of weeks. Unless you are working on a workstation - just forget it :)
Other things to consider: how you foresee the calibration process of your model? How to you foresee the use of  such a model?
I can already tel you, that it will be nearly impossible to calibrate such a model (I mean to do a good calibration, ensuring all the processes are adequate, etc).
Next, the model runtime will be, most likely, several hours for ~10 years.

My advise, i) either use a coarser resolution (much coarser), ii) split your model in sub-models, iii) ditch the "standard" tools and use sciprs instead, or iv) brace yourself for a loooong wait on every step (not as long as some numerical models, but still.. I get inpatient and that is saying something ;) ) with an even longer and tedious calibration.
Best,
Natalja

Naveed Ahmed

unread,
Dec 4, 2020, 5:42:42 AM12/4/20
to swat...@googlegroups.com
Hi Natalija,
First of all many many thanks for a very detailed guidance.
I am using ArcSWAT since three years and I am familiar with ArcSWAT. I have already simulated the ArcSWAT for a river basin with 1.69x10^6 km^2 and it didn’t not take much time. The reason is DEM was coarse resolution. 

I am using a workstation of DELL precision series i-5, 7th generation with 24 GB RAM. 
Thanks for your advice and I will surely use the coarse resolution DEM to complete this project.


Regards 
Naveed

--
You received this message because you are subscribed to the Google Groups "SWAT-CUP" group.
To unsubscribe from this group and stop receiving emails from it, send an email to swat-cup+u...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/swat-cup/b5f62704-ba22-40e5-8178-e10ffb58af17n%40googlegroups.com.

Suraj Shah

unread,
Dec 4, 2020, 5:57:22 AM12/4/20
to swat...@googlegroups.com
Yes Naveed bro ...may be your Dem has some problem...


Naveed Ahmed

unread,
Dec 4, 2020, 6:13:47 AM12/4/20
to swat...@googlegroups.com
Hi dear,
I don’t think so. However I an trying to reduce the size of DEM using GEE. This way the resolution will remain same 30x30 and only size will reduce.


Suraj Shah

unread,
Dec 4, 2020, 6:28:07 AM12/4/20
to swat...@googlegroups.com
Naveed bro 
I think you are from UCAS..let's talk in wechat
I will add you..

Naveed Ahmed

unread,
Dec 4, 2020, 6:37:54 AM12/4/20
to swat...@googlegroups.com
Hi dear,
Yes, I am from UCAS. Do you know me 😊? If yes, plz add me on WeChat.
Thanks 

Reply all
Reply to author
Forward
0 new messages