> If you can send me an example of what you need (may be a simple hand
> drawn illustration or dummy graph in excel), then I will see what can
> be done. May be I can add it into the next version.
Thanks!
Please find attached an example:
- the chart is for one project directory (/project/trunk)
- green: added lines, blue: modified lines, red: deleted lines
- one bar per week, or per month when time is too long
- time begins at creation of project
- time ends at head-revision or when activity ends (to be defined,
perhaps with a threshold of minimum lines per time)
- chart for whole project or only one author of the project as option
The main motivation for such a chart is to see, what the developers
spend their time on.
How do you decide, if a line is modified or deleted and added?
Cheers, Peter